Wisconsin Administrative Code
Public Service Commission
Chapter PSC 134 - Standards For Gas Service
Section PSC 134.31 - Request and referee tests
Current through August 26, 2024
(1) Each utility furnishing gas service shall make a test of the accuracy of any gas meter upon request of the customer, provided the customer does not request such test more frequently than once in 6 months. A report giving the results of each request test shall be made to the customer and the complete, original record shall be kept on file in the office of the utility. A customer or group of customers may not abuse the request test procedures. Abuse shall be determined by the commission.
(2) Any gas meter may be tested by a commission inspector upon written application of the customer. For such test, a fee shall be forwarded to the commission by the customer with the application. The amount of this fee shall be refunded to the customer by the utility if the meter is found to be more than 2% fast as determined in s. PSC 134.14(1). The amount of the fee that is to be remitted for such tests shall be $5 for each consumption meter that has a rated capacity not exceeding 1,000 cubic feet per hour; for larger consumption meters, demand meters, etc., the test fee shall be the actual expense of the test.
(3) All referee meter tests shall include an inspection of the meter index by removing the index from the meter body. The dials, gears and all other parts of the index shall be visually inspected for wear, misalignment or other mechanical defects which would affect the accuracy of the meter on a continuing or sporadic basis. Any defects affecting the meter's accuracy shall be noted and evaluated in the report of the test.
(4) METER RETENTION.