Wisconsin Administrative Code
Public Service Commission
Chapter PSC 113 - Service Rules For Electrical Utilities
Subchapter IX - Electric Meter Testing Programs and Record Requirements
Section PSC 113.0922 - Customer request and commission referee tests
Current through August 26, 2024
(1) CUSTOMER REQUEST TEST. Each utility shall promptly make a test of any metering installation upon request of the customer if 24 months or more have elapsed since the last requested test of the meter in the same location. The test shall consist of an inspection of the meter connections and a test for accuracy either at the utility testing shop or on the customer's premises. The commission staff may order a meter test if it deems necessary. At the customer's request and expense the installation shall be checked for accidental grounds. The customer shall be furnished a report of the result of the test. (See s. PSC 113.0924 for adjustment of bills for inaccurate meters.)
(2) COMMISSION REFEREE TEST. Upon written application to the commission by any electric utility customer, the commission will referee a test covering the accuracy and integrity of the customer's power meter installation, including an inspection and verification of the connections and any other check or test which appears desirable. The test will be performed in accordance with ss. PSC 113.0905 through 113.0915 as applicable and shall be made in accordance with s. PSC 113.0811(1) (c). The commission may limit the availability, number or frequency of such referee tests for the same customer at the same location where, in its judgment, the requests are too frequent, burdensome, abusive, or otherwise unwarranted by the available information or evidence.
(3) METER RETENTION.
(4) RECORDS RETENTION REQUIREMENTS. A utility shall keep the complete, original record from any test under this section on file for the time period specified in s. PSC 113.0614.