Wisconsin Administrative Code
Public Service Commission
Chapter PSC 113 - Service Rules For Electrical Utilities
Subchapter IX - Electric Meter Testing Programs and Record Requirements
- Section PSC 113.0901 - Testing of metering installations-general requirements
- Section PSC 113.0902 - Testing equipment
- Section PSC 113.0903 - Accuracy and calibration of test standards
- Section PSC 113.0904 - Watthour calibration
- Section PSC 113.0905 - Methods of testing watthour meters
- Section PSC 113.0906 - Methods of testing block-interval demand registers
- Section PSC 113.0907 - Methods of testing block-interval pulse-operated demand meters and pulse recorders
- Section PSC 113.0908 - Methods of testing electronic (solid state) meters
- Section PSC 113.0909 - Methods of testing electronic registers
- Section PSC 113.0910 - Methods of testing electronic demand registers
- Section PSC 113.0911 - Testing of self-contained single-phase meters and 3-wire network meters at fixed periodic intervals
- Section PSC 113.0912 - Testing of self-contained polyphase meters
- Section PSC 113.0913 - Testing of meters used with instrument transformers on single-phase service
- Section PSC 113.0914 - Testing of polyphase electromechanical and completely solid state electronic meters used with instrument transformers at fixed periodic intervals
- Section PSC 113.0915 - Testing of metering installations utilizing pulse devices
- Section PSC 113.0916 - Testing of instrument transformers
- Section PSC 113.0917 - Phase-shifting transformers and loss compensators
- Section PSC 113.0918 - Adoption of standard by reference
- Section PSC 113.0919 - Metering equipment records
- Section PSC 113.0920 - Statistical sample testing plan for new self-contained single phase and 3-wire network meters
- Section PSC 113.0921 - Statistical sample testing plan for in-service, electronic (solid state) meters and electromechanical, self-contained, single phase and 3-wire network meters
- Section PSC 113.0922 - Customer request and commission referee tests
- Section PSC 113.0923 - Commission referee test
- Section PSC 113.0924 - Adjustment of bills for metering inaccuracies
- Section PSC 113.0925 - Billings for grounds
- Section PSC 113.0926 - Metering with one meter for net energy billing
Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.