Wisconsin Administrative Code
Department of Natural Resources
NR 700-799 - Environmental Protection - Investigation and Remediation of Environmental Contamination
Chapter NR 724 - Remedial and interim action design, implementation, operation, maintenance and monitoring requirements
Section NR 724.11 - Design plans and specifications
Current through August 26, 2024
Unless otherwise directed by the department, responsible parties shall submit to the department design plans and specifications for each remedial action and any of the interim actions specified in s. NR 724.02(1). Plans and specifications shall:
(1)Be consistent with the concepts presented in the design report prepared under s. NR 724.09.
(2)Provide a general correlation between drawings and technical specifications.
(3)Include technical specifications and requirements necessary for all the components of the remedial or interim action.
(4)Include detailed drawings of the proposed design, including general component arrangements, equipment layout, process flow diagram, piping and instrumentation diagrams, cross sections, sampling locations and instrumentation locations.
(5)Show sufficient detail for construction, according to customary industrial and professional standards.
(6)Unless otherwise directed by the department, include legible visual aids, including maps, plan sheets, drawings, isometrics, cross sections and aerial photographs, which:
Note: Examples of land-based features include covers, waste or soil piles, soil treatment piles, liners, landfills and features created by earth moving and regrading.
(7)Include descriptions, specifications and performance criteria necessary for procurement, construction and start up of all features and units, including key components and all instrumentation. Performance curves or criteria published by equipment suppliers or manufacturers may be utilized if they provide sufficient information.