Wisconsin Administrative Code
Department of Natural Resources
NR 600-699 - Environmental Protection - Hazardous Waste Management
Chapter NR 667 - Standards For Owners And Operators Of Hazardous Waste Facilities Operating Under A Standardized License
Subchapter J - Tank Systems
Section NR 667.0192 - What handling and inspection procedures shall I follow during installation of new tank systems?

Current through August 26, 2024

(1) Ensure that you follow proper handling procedures to prevent damage to a new tank system during installation. Before placing a new tank system or component in use, an independent, qualified installation inspector or an independent, qualified, registered professional engineer, either of whom is trained and experienced in the proper installation of tank systems or components shall inspect the system for the presence of any of the following items:

(a) Weld breaks.

(b) Punctures.

(c) Scrapes of protective coatings.

(d) Cracks.

(e) Corrosion.

(f) Other structural damage or inadequate construction or installation.

(2) Remedy all discrepancies before the tank system is placed in use.

Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.