Section NR 665.0301 - Design and operating requirements
Current through August 26, 2024
(1) The owner or operator of each new landfill unit, each lateral expansion of a landfill unit, and each replacement of an existing landfill unit shall install 2 or more liners and a leachate collection and removal system above and between the liners, and operate the leachate collection and removal systems in accordance with s. NR 664.0301(3), unless exempted under s. NR 664.0301(4), (5), or (6).
(2) The owner or operator of each unit referred to in sub. (1) shall notify the department at least 60 days prior to receiving waste. The owner or operator of each facility submitting notice shall file a feasibility and plan of operation report within 6 months after the department receives the notice.
(3) The owner or operator of any replacement landfill unit is exempt from sub. (1) if both of the following apply:
(4) The double liner requirement in sub. (1) may be waived by the department for any monofill, if pars. (a) and (b) 1. or 2. apply:
(5) In the case of any unit in which the liner and leachate collection system has been installed pursuant to the requirements of sub. (1) and in good faith compliance with sub. (1) and with guidance documents governing liners and leachate collection systems under sub. (1), no liner or leachate collection system which is different from that which was so installed pursuant to sub. (1) will be required for the unit by the department when issuing the first operating license to the facility, except that the department will not be precluded from requiring installation of a new liner when the department has reason to believe that any liner installed pursuant to the requirements of sub. (1) is leaking.
(6) The owner or operator shall design, construct, operate and maintain a run-on control system capable of preventing flow onto the active portion of the landfill during peak discharge from at least a 25-year storm.
(7) The owner or operator shall design, construct, operate and maintain a run-off management system to collect and control at least the water volume resulting from a 24-hour, 25-year storm.
(8) Collection and holding facilities (e.g., tanks or basins) associated with run-on and run-off control systems shall be emptied or otherwise managed expeditiously after storms to maintain design capacity of the system.
(9) The owner or operator of a landfill containing hazardous waste which is subject to dispersal by wind shall cover or otherwise manage the landfill so that wind dispersal of the hazardous waste is controlled.
As required by s. NR 665.0013, the waste analysis plan shall include analyses needed to comply with ss. NR 665.0312, 665.0313 and 665.0314. As required by s. NR 665.0073, the owner or operator shall place the results of these analyses in the operating record of the facility.