Wisconsin Administrative Code
Department of Natural Resources
NR 600-699 - Environmental Protection - Hazardous Waste Management
Chapter NR 665 - Interim License Hazardous Waste Treatment, Storage And Disposal Facility Standards
Subchapter L - Waste Piles
Section NR 665.0254 - Design and operating requirements

Current through August 26, 2024

The owner or operator of each new waste pile on which construction commences after June 1, 1995, each lateral expansion of a waste pile unit on which construction commences after June 1, 1995 and each replacement of an existing waste pile unit that is to commence reuse after June 1, 1995 shall install 2 or more liners and a leachate collection and removal system above and between the liners, and operate the leachate collection and removal systems in accordance with s. NR 664.0251(3), unless exempted under s. NR 664.0251(4), (5) or (6), and shall comply with the procedures of s. NR 665.0221(2). "Construction commences" is as defined in s. NR 660.10 under "existing facility".

Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.