Wisconsin Administrative Code
Department of Natural Resources
NR 600-699 - Environmental Protection - Hazardous Waste Management
Chapter NR 665 - Interim License Hazardous Waste Treatment, Storage And Disposal Facility Standards
Subchapter F - Groundwater Monitoring
Section NR 665.0092 - Sampling and analysis
Current through August 26, 2024
(1) The owner or operator shall obtain and analyze samples from the installed groundwater monitoring system. The owner or operator shall develop and follow a groundwater sampling and analysis plan. Chemical and physical samples shall be analyzed by a laboratory certified or registered under ch. NR 149, except for field analyses for pH, specific conductance and temperature. The owner or operator shall keep this plan at the facility. The plan shall include procedures and techniques for all of the following:
Note: See "Procedures Manual For Ground-water Monitoring At Solid Waste Disposal Facilities," EPA-530/SW-611, and "Methods for Chemical Analysis of Water and Wastes," EPA-600/4-79-020, for discussions of sampling and analysis procedures.
(2) The owner or operator shall determine the concentration or value of all of the following parameters in groundwater samples in accordance with subs. (3) and (4):
Note: These parameters are to be used as a basis for comparison in the event a groundwater quality assessment is required under s. NR 665.0093(4).
pH.
(3)
(4) After the first year, all monitoring wells shall be sampled and the samples analyzed with the following frequencies:
(5) Elevation of the groundwater surface at each monitoring well shall be determined each time a sample is obtained.