(1) Owners or operators of new tank systems or components shall obtain and submit to the department, at time of submittal of the feasibility and plan of operation report, a written assessment, reviewed and certified by a qualified professional engineer, in accordance with s. NR 670.011(4), attesting that the tank system has sufficient structural integrity and is acceptable for the storing and treating of hazardous waste. The assessment shall show that the foundation, structural support, seams, connections and pressure controls (if applicable) are adequately designed and that the tank system has sufficient structural strength, compatibility with the wastes to be stored or treated and corrosion protection to ensure that it will not collapse, rupture or fail. This assessment, which will be used by the department to review and approve or disapprove the acceptability of the tank system design, shall include, at a minimum, all of the following information:
Note: The practices described in the National Association of Corrosion Engineers (NACE) standard, "Recommended Practice (RP-02-85)-Control of External Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems", and the American Petroleum Institute (API) Publication 1632, "Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems", may be used, where applicable, as guidelines in providing corrosion protection for tank systems.
(2) The owner or operator of a new tank system shall ensure that proper handling procedures are adhered to in order to prevent damage to the system during installation. Prior to covering, enclosing or placing a new tank system or component in use, an independent, qualified installation inspector or a qualified professional engineer, either of whom is trained and experienced in the proper installation of tank systems or components, shall inspect the system for the presence of any of the following items:
All discrepancies shall be remedied before the tank system is covered, enclosed or placed in use.
(3) New tank systems or components that are placed underground and that are backfilled shall be provided with a backfill material that is a noncorrosive, porous, homogeneous substance and that is installed so that the backfill is placed completely around the tank and compacted to ensure that the tank and piping are fully and uniformly supported.
(4) All new tanks and ancillary equipment shall be tested for tightness prior to being covered, enclosed or placed in use. If a tank system is found not to be tight, all repairs necessary to remedy the leaks in the system shall be performed prior to the tank system being covered, enclosed or placed into use.
(5) Ancillary equipment shall be supported and protected against physical damage and excessive stress due to settlement, vibration, expansion or contraction.
Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615 (November 1979), "Installation of Underground Petroleum Storage Systems", or ANSI Standard B31.3, "Petroleum Refinery Piping", and ANSI Standard B31.4 "Liquid Petroleum Transportation Piping System", may be used, where applicable, as guidelines for proper installation of piping systems.
(6) The owner or operator shall provide the type and degree of corrosion protection recommended by an independent corrosion expert, based on the information provided under sub. (1) (c), or other corrosion protection if the department believes other corrosion protection is necessary to ensure the integrity of the tank system during use of the tank system. An independent corrosion expert shall supervise the installation of a corrosion protection system that is field fabricated, to ensure proper installation.
(7) The owner or operator shall obtain and keep on file at the facility written statements by those persons required to certify the design of the tank system and supervise the installation of the tank system in accordance with the requirements of subs. (2) to (6), that attest that the tank system was properly designed and installed and that repairs, pursuant to subs. (2) and (4), were performed. These written statements shall also include the certification statement as required in s. NR 670.011(4).