Wisconsin Administrative Code
Department of Natural Resources
NR 500-599 - Environmental Protection - Solid Waste Management
Chapter NR 516 - Landfill Construction Documentation
Section NR 516.08 - Testing requirements for landfills with extended collection lines
Current through August 26, 2024
(1) REQUIREMENTS. Landfills shall meet the requirements of subs.(2) and (3) where they will accept municipal solid waste and contain leachate collection lines that exceed 1,200 feet from the end of each cleanout to the toe of the opposite slope. Where the requirements of this section differ from other requirements of this chapter, these requirements shall take precedence.
(2) PIPE AND TRENCH. In addition to the information specified in s. NR 516.04(3) (d), reports documenting the construction of all new landfill areas shall include the following information, at a minimum:
(3) SOIL TESTING. Testing shall be performed during the construction of any landfill areas. At a minimum, this testing shall include test results from a minimum of one hydraulic conductivity test performed on representative samples of drainage media used for the leachate collection blanket and for the leachate collection trench backfill. The test procedure and any adaptations used to accommodate high-capacity drainage material shall be identified.