Wisconsin Administrative Code
Department of Natural Resources
NR 500-599 - Environmental Protection - Solid Waste Management
Chapter NR 507 - Environmental Monitoring For Landfills
Section NR 507.11 - Gas monitoring well design and installation
Current through August 26, 2024
All gas monitoring wells shall be designed, installed and documented in accordance with ss. NR 507.04, 507.05, and 507.06(1) (2) and 507.14 and the requirements of this section unless the department approves alternate methods in writing. All gas monitoring wells shall be designed, located, installed and maintained so as to obtain reliable and representative information regarding soil conditions and gas concentrations.
(1) TIMING OF INSTALLATION. Where gas monitoring is required, gas monitoring wells shall be installed at the same time that adjacent areas of the landfill liner are constructed.
(2) DESIGN. All gas monitoring wells shall be constructed with a shut-off valve to prevent the escape of gas from the sampling device and minimize the amount of inflow of air from the atmosphere.
(3) LOCATION. All gas monitoring wells shall meet both of the following: