Wisconsin Administrative Code
Department of Natural Resources
NR 500-599 - Environmental Protection - Solid Waste Management
Chapter NR 504 - Landfill Location, Performance, Design And Construction Criteria
Section NR 504.12 - Minimum design and construction criteria for CCR landfills
Current through August 26, 2024
(1) APPLICABILITY. In addition to ss. NR 504.04 to 504.10, applicable to all landfills or landfills accepting high volume industrial waste, this section includes design criteria that are applicable to the construction of a new or existing CCR landfill or a lateral expansion of a CCR landfill.
(2) RUN-ON AND RUN-OFF CONTROLS. An existing or new CCR landfill or any lateral expansion of a CCR landfill shall be designed, constructed, operated, and maintained with a run-off and run-on control system in accordance with the requirements under s. NR 504.09 (1) (f) and (g) and all of the following:
(3) LINER DESIGN.
Q/A = q = k (h/t + 1)
Where:
Q = flow rate (cubic centimeters / second).
A = surface area of the liner (squared centimeters).
q = flow rate per unit area (cubic centimeters / second / squared centimeter).
k = hydraulic conductivity of the liner (centimeters / second).
h = hydraulic head above the liner (centimeters).
t = thickness of the liner (centimeters).
Note: A new CCR landfill or lateral expansion of a CCR landfill is also required to comply with s. NR 504.06 (2) (b) or (4) for zone-of-saturation landfills. The definition of an uppermost aquifer can be found under s. NR 500.03 (246m).
(4) FINAL COVER SYSTEM.