(1) WHAT EMISSION LIMITS MUST I MEET?
(a) You shall meet each of the following
emission limits or standards that applies to you:
1. For each electric arc metal melting
furnace, electric induction metal melting furnace or scrap preheater at an
existing iron and steel foundry, as described in s.
NR 463.21(3)
(c), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for particulate
matter (PM) in subd. 1. a. or the limit for total metal HAP in subd. 1. b.:
a. 0.005 gr/dscf of PM.
b. 0.0004 gr/dscf of total metal
HAP.
2. For each cupola
metal melting furnace at an existing iron and steel foundry, as described in s.
NR 463.21(3)
(c), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for PM in subd. 2.
a. or the limit for total metal HAP in subd. 2. b.:
a. 0.006 gr/dscf of PM.
b. 0.0005 gr/dscf of total metal
HAP.
3. For each cupola
metal melting furnace or electric arc metal melting furnace at a new iron and
steel foundry, as described in s.
NR 463.21(3)
(d), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for PM in subd. 3.
a. or, alternatively, the limit for total metal HAP in subd. 3. b.:
a. 0.002 gr/dscf of PM.
b. 0.0002 gr/dscf of total metal
HAP.
4. For each
electric induction metal melting furnace or scrap preheater at a new iron and
steel foundry, as described in s.
NR 463.21(3)
(d), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for PM in subd. 4.
a. or, alternatively, the limit for total metal HAP in subd. 4. b.:
a. 0.001 gr/dscf of PM.
b. 0.00008 gr/dscf of total metal
HAP.
5. For each pouring
station at an existing iron and steel foundry, as described in s.
NR 463.21(3)
(c), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for PM in subd. 5.
a. or, alternatively, the limit for total metal HAP in subd. 5. b.:
a. 0.010 gr/dscf of PM.
b. 0.0008 gr/dscf of total metal
HAP.
6. For each pouring
area or pouring station at a new iron and steel foundry, as described in s.
NR 463.21(3)
(d), you may not discharge emissions through
a conveyance to the atmosphere that exceed either the limit for PM in subd. 6.
a. or, alternatively, the limit for total metal HAP in subd. 6. b.:
a. 0.002 gr/dscf of PM.
b. 0.0002 gr/dscf of total metal
HAP.
7. For each
building or structure housing any emissions source at the iron and steel
foundry, you may not discharge any fugitive emissions to the atmosphere that
exhibit opacity greater than 20% averaged over 6 minutes except for one
6-minute average per hour that does not exceed 27% opacity.
8. For each cupola metal melting furnace at a
new or existing iron and steel foundry, you may not discharge emissions of
volatile organic hazardous air pollutants (VOHAP) through a conveyance to the
atmosphere that exceed 20 parts per million by volume (ppmv) corrected to 10%
oxygen.
9. As an alternative to the
work practice standard in sub. (2) (e) for a scrap preheater at an existing
iron and steel foundry or in sub. (2) (f) for a scrap preheater at a new iron
and steel foundry, as described in s.
NR 463.21(3)
(d), you may not discharge emissions of VOHAP
through a conveyance to the atmosphere that exceed 20 ppmv.
10. For one or more automated conveyor and
pallet cooling lines that use a sand mold system, or one or more automated
shakeout lines that use a sand mold system, at a new iron and steel foundry, as
described in s.
NR 463.21(3)
(d), you may not discharge emissions of VOHAP
through a conveyance to the atmosphere that exceed a flow-weighted average of
20 ppmv.
11. For each triethylamine
(TEA) cold box mold or core making line at a new or existing iron and steel
foundry, you shall meet either the emission limit in subd. 11. a. or the
emission standard in subd. 11. b.:
a. You may
not discharge emissions of TEA through a conveyance to the atmosphere that
exceed 1 ppmv, as determined when scrubbing with fresh acid solution.
b. You shall reduce emissions of TEA from
each TEA cold box mold or core making line by at least 99%, as determined when
scrubbing with fresh acid solution.
(b) You shall meet each of the following
operating limits that applies to you:
1. You
shall install, operate and maintain a capture and collection system for all
emission sources subject to an emission limit or standard for VOHAP or TEA in
par. (a) 8. to 11. in accordance with both of the following:
a. Each capture and collection system shall
meet accepted engineering standards, such as those published by the American
Conference of Governmental Industrial Hygienists.
Note: Publications of the American Conference of Governmental Industrial Hygienists may be obtained at:
NR 463.23 Note American Conference of Governmental Industrial Hygienists
1330 Kemper Meadow Drive
Cincinnati, Ohio 45240
(513) 742-2020
mail@acgih.org
b. You shall operate each capture
system at or above the lowest value or settings established as operating limits
in your operation and maintenance plan.
2. You shall operate each wet scrubber
applied to emissions from a metal melting furnace, scrap preheater, pouring
area or pouring station subject to an emission limit for PM or total metal HAP
in par. (a) 1. to 6. to insure that the 3-hour average pressure drop and
scrubber water flow rate does not fall below the minimum levels established
during the initial or subsequent performance test.
3. You shall operate each combustion device
applied to emissions from a cupola metal melting furnace subject to the
emission limit for VOHAP in par. (a) 8. to insure that the 15-minute average
combustion zone temperature does not fall below 1,300ºF. Periods when the
cupola is off blast and for 15 minutes after going on blast from an off blast
condition are not included in the 15-minute average.
4. You shall operate each combustion device
applied to emissions from a scrap preheater subject to the emission limit for
VOHAP in par. (a) 9. or from a TEA cold box mold or core making line subject to
the emission limit for TEA in par. (a) 11. to insure that the 3-hour average
combustion zone temperature does not fall below the minimum level established
during the initial or subsequent performance test.
5. You shall operate each wet acid scrubber
applied to emissions from a TEA cold box mold or core making line subject to
the emission limit for TEA in par. (a) 11. to insure both of the following:
a. The 3-hour average scrubbing liquid flow
rate does not fall below the minimum level established during the initial or
subsequent performance test.
b. The
3-hour average pH of the scrubber blowdown, as measured by a continuous
parameter monitoring system (CPMS), does not exceed 4.5 or the pH of the
scrubber blowdown, as measured once every 8 hours during process operations,
does not exceed 4.5.
(c) If you use a control device other than a
baghouse, wet scrubber, wet acid scrubber or combustion device, you shall
prepare and submit a monitoring plan. The monitoring plan is subject to
approval by the department and shall contain all of the following:
1. A description of the device.
2. Test results collected in accordance with
s.
NR 463.25(3) verifying the performance
of the device for reducing emissions of PM, total metal HAP, VOHAP or TEA to
the levels required by this subchapter.
3. A copy of the operation and maintenance
plan required by sub. (3) (b).
4. A
list of appropriate operating parameters that will be monitored to maintain
continuous compliance with the applicable emissions limitations.
5. Operating parameter limits based on
monitoring data collected during the performance test.
(2) WHAT WORK PRACTICE STANDARDS MUST I MEET?
(a) For each segregated
scrap storage area, bin or pile, you shall either comply with the certification
requirements in par. (b) or prepare and implement a plan for the selection and
inspection of scrap according to the requirements in par. (c). You may have
certain scrap subject to par. (b) and other scrap subject to par. (c) at your
facility, provided the scrap remains segregated until being aggregated to make
up the charge for the furnace.
(b)
If you elect to meet this paragraph as allowed under par. (a), you shall
prepare, and operate at all times according to, a written certification that
the foundry purchases and uses only metal ingots, pig iron, slitter or other
materials that do not include post-consumer automotive body scrap,
post-consumer engine blocks, post-consumer oil filters, oily turnings, lead
components, mercury switches, plastics or free organic liquids, as defined in
s.
NR 463.22(16). Any post-consumer engine
blocks, post-consumer oil filters or oily turnings that are processed and
cleaned, to the extent practicable, such that the materials do not include lead
components, mercury switches, plastics or free organic liquids may be included
in this certification.
(c) If you
elect to meet this paragraph as allowed under par. (a), you shall prepare and
operate at all times according to a written plan for the selection and
inspection of iron and steel scrap to minimize, to the extent practicable, the
amount of organics and HAP metals in the charge materials used by the iron and
steel foundry. This scrap selection and inspection plan is subject to approval
by the department. You shall keep a copy of the plan onsite and readily
available to all plant personnel with materials acquisition or inspection
duties. You shall provide a copy of the material specifications to each of your
scrap vendors. Each plan shall include all of the following information:
1. A materials acquisition program to limit
organic contaminants according to the following requirements as applicable:
a. For scrap charged to a scrap preheater,
electric arc metal melting furnace or electric induction metal melting
furnaces, specifications for scrap materials to be depleted, to the extent
practicable, of the presence of used oil filters, plastic parts and organic
liquids, and a program to ensure the scrap materials are drained of free
liquids.
b. For scrap charged to a
cupola metal melting furnace, specifications for scrap materials to be
depleted, to the extent practicable, of the presence of plastic, and a program
to ensure the scrap materials are drained of free liquids.
2. A materials acquisition program specifying
that the scrap supplier remove accessible mercury switches from the trunks and
hoods of any automotive bodies contained in the scrap and remove accessible
lead components such as batteries and wheel weights. You shall obtain and
maintain onsite a copy of the procedures used by the scrap supplier for either
removing accessible mercury switches or for purchasing automobile bodies that
have had mercury switches removed, as applicable.
3. Procedures for visual inspection of a
representative portion, but not less than 10%, of all incoming scrap shipments
to ensure the materials meet the specifications. The inspection procedures
shall do all of the following:
a. Identify
the locations where inspections are to be performed for each type of shipment.
Inspections may be performed at the scrap supplier's facility. The selected
locations shall provide a reasonable vantage point, considering worker safety,
for visual inspection.
b. Include
recordkeeping requirements for the documentation of each visual inspection
including the results.
c. Include
provisions for rejecting or returning entire or partial scrap shipments that do
not meet specifications and limiting purchases from vendors whose shipments
fail to meet specifications for more than 3 inspections in one calendar
year.
d. If the inspections are
performed at the scrap supplier's facility, include an explanation of how the
periodic inspections ensure that not less than 10% of scrap purchased from each
supplier is subject to inspection.
(d) For each furan warm box mold or core
making line in a new or existing iron and steel foundry, you shall use a binder
chemical formulation that does not contain methanol as a specific ingredient of
the catalyst formulation as determined by the material safety data sheet. This
requirement does not apply to the resin portion of the binder system.
(e) For each scrap preheater at an existing
iron and steel foundry, you shall meet either of the following requirements,
or, as an alternative, you may meet the VOHAP emissions limit in sub. (1) (a)
9.:
1. You shall install, operate and
maintain a gas-fired preheater where the flame directly contacts the scrap
charged.
2. You shall charge only
material that is subject to and in compliance with the scrap certification
requirement in par. (b).
(f) For each scrap preheater at a new iron
and steel foundry, you shall charge only material that is subject to, and in
compliance with, the scrap certification requirement in par. (b). As an
alternative to this requirement, you may meet the VOHAP emissions limit in sub.
(1) (a) 9.
(3) WHAT ARE MY OPERATION AND MAINTENANCE REQUIREMENTS?
(a)
As required by s.
NR 460.05(4) (a) 1., you shall always
operate and maintain your iron and steel foundry, including air pollution
control and monitoring equipment, in a manner consistent with good air
pollution control practices for minimizing emissions at least to the levels
required by this subchapter.
(b)
You shall prepare, and operate at all times according to, a written operation
and maintenance plan for each capture and collection system and control device
for an emissions source subject to an emissions limit in sub. (1) (a). Your
operation and maintenance plan shall also include procedures for igniting gases
from mold vents in pouring areas and pouring stations that use a sand mold
system. The operation and maintenance plan is subject to approval by the
department and shall contain all of the following elements:
1. Monthly inspections of the equipment that
is important to the performance of the total capture system, such as pressure
sensors, dampers and damper switches. The inspections shall include
observations of the physical appearance of the equipment, such as the presence
of holes in the ductwork or hoods, flow constrictions caused by dents or
accumulated dust in the ductwork and fan erosion. The operation and maintenance
plan shall also include requirements to repair the defect or deficiency as soon
as practicable.
2. Operating limits
for each capture system for an emissions source subject to an emissions limit
or standard for VOHAP or TEA in sub. (1) (a) 8. to 11. You shall establish the
operating limits according to all of the following requirements:
a. You shall select operating limit
parameters appropriate for the capture system design that are representative
and reliable indicators of the performance of the capture system. At a minimum,
you shall use appropriate operating limit parameters that indicate the level of
the ventilation draft and damper position settings for the capture system when
operating to collect emissions, including revised settings for seasonal
variations. Appropriate operating limit parameters for ventilation draft
include volumetric flow rate through each separately ducted hood, total
volumetric flow rate at the inlet to the control device to which the capture
system is vented, fan motor amperage or static pressure. Any parameter for
damper position setting may be used that indicates the duct damper position
related to the fully open setting.
b. For each operating limit parameter
selected in subd. 2. a., you shall designate the value or setting for the
parameter at which the capture system operates during the process operation. If
your operation allows for more than one process to be operating simultaneously,
you shall designate the value or setting for the parameter at which the capture
system operates during each possible configuration that you may operate, for
example the operating limits with one furnace melting or 2 melting, as
applicable to your plant.
c. You
shall include documentation in your plan to support your selection of the
operating limits established for your capture system. This documentation shall
include a description of the capture system design, a description of the
capture system operating during production, a description of each selected
operating limit parameter, a rationale for why you chose the parameter, a
description of the method used to monitor the parameter according to the
requirements of s.
NR 463.26(1)
(a) and the data used to establish the value
or setting for the parameter for each of your process configurations.
3. A preventive
maintenance plan for each control device, including a preventive maintenance
schedule that is consistent with the manufacturer's instructions for routine
and long-term maintenance.
4. A
site-specific monitoring plan for each bag leak detection system. For each bag
leak detection system that operates on the triboelectric effect, the monitoring
plan shall be consistent with the recommendations contained in the U.S.
Environmental Protection Agency guidance document "Fabric Filter Bag Leak
Detection Guidance'', EPA-454/R-98-015, incorporated by reference in s.
NR 484.06(4)
(c). The owner or operator shall operate and
maintain the bag leak detection system according to the site-specific
monitoring plan at all times. The baghouse monitoring plan is subject to
approval by the department and shall address all of the following items:
a. Installation of the bag leak detection
system.
b. Initial and periodic
adjustment of the bag leak detection system, including how the alarm set-point
will be established.
c. Operation
of the bag leak detection system including quality assurance
procedures.
d. How the bag leak
detection system will be maintained, including a routine maintenance schedule
and spare parts inventory list.
e.
How the bag leak detection system output will be recorded and stored.
5. A corrective action plan for
each baghouse. The plan shall include the requirement that, in the event a bag
leak detection system alarm is triggered, you shall initiate corrective action
to determine the cause of the alarm within one hour of the alarm, initiate
corrective action to correct the cause of the problem within 24 hours of the
alarm and complete the corrective action as soon as practicable. Corrective
actions taken may include any of the following:
a. Inspecting the baghouse for air leaks,
torn or broken bags or filter media or any other condition that may cause an
increase in emissions.
b. Sealing
off defective bags or filter media.
c. Replacing defective bags or filter media
or otherwise repairing the control device.
d. Sealing off a defective baghouse
compartment.
e. Cleaning the bag
leak detection system probe or otherwise repairing the bag leak detection
system.
f. Making process
changes.
g. Shutting down the
process producing the PM emissions.
6. Procedures for providing an ignition
source to mold vents of sand mold systems in each pouring area and pouring
station unless you determine the mold vent gases either are not ignitable,
ignite automatically or cannot be ignited due to accessibility or safety
issues. You shall document and maintain records of the determination of
ignitability, accessibility and safety. The determination may encompass
multiple casting patterns provided the castings utilize similar sand-to-metal
ratios, binder formulations and coating materials. The determination of
ignitability shall be based on observations of the mold vents within 5 minutes
of pouring, and the flame shall be present for at least 15 seconds for the mold
vent to be considered ignited. For the purpose of the determination made under
this subdivision, both of the following apply:
a. Mold vents that ignite more than 75% of
the time without the presence of an auxiliary ignition source are considered to
ignite automatically.
b. Mold vents
that do not ignite automatically and cannot be ignited in the presence of an
auxiliary ignition source more than 25% of the time are considered to be not
ignitable.
Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.