(1) FEES
REQUIRED. Any person who submits an asbestos abatement notification under ch.
NR 447 shall pay the fees in subs. (2) and (3). The fees shall be submitted
with the completed notification required under ch. NR 447 and are
non-refundable.
(2) PERMIT
EXEMPTION REVIEW FEE. Any person requiring a determination of exemption under
s.
NR 406.04(1) (n) shall pay one of the
following amounts:
(a) $50 for a
determination of exemption if the asbestos renovation or demolition operation
involves at least 260 linear feet or at least 160 square feet of regulated
asbestos containing material and a combined square and linear footage of less
than 1000. The combination of square and linear footage shall be determined by
adding the square footage of asbestos containing material on all areas other
than pipes to the linear footage of asbestos containing material on
pipes.
(b) $125 for a determination
of exemption if the asbestos renovation or demolition operation involves
regulated asbestos containing material with a combined square and linear
footage of equal to or greater than 1000. The combination of square and linear
footage shall be determined by the method given in par. (a).
(3) INSPECTION FEE. The amount of
the asbestos abatement project inspection fee shall be:
(a) $135 if, in a facility being demolished,
the amount of regulated asbestos containing material is less than 260 linear
feet on pipes and less than 160 square feet on other facility
components.
(b) $350 if the
asbestos renovation or demolition operation involves at least 260 linear feet
or at least 160 square feet of regulated asbestos containing material and a
combined square and linear footage of less than 1000. The combination of square
and linear footage shall be determined by the method given in sub. (2)
(a).
(c) $575 if the asbestos
renovation or demolition operation involves regulated asbestos containing
material with a combined square and linear footage of equal to or greater than
1000 and less than 5000. The combination of square and linear footage shall be
determined by the method given in sub. (2) (a).
(d) $1200 if the asbestos renovation or
demolition operation involves regulated asbestos containing material with a
combined square and linear footage of equal to or greater than 5000. The
combination of square and linear footage shall be determined by the method
given in sub. (2) (a).
(e) $100 if
the property is to be demolished by intentional burning as a community fire
safety training project.
(f) An
amount equal to and in addition to the inspection fee specified in pars. (a) to
(d) to inspect property for a project for which a notice of an asbestos
renovation or demolition activity was not provided before the work
began.
(4) NOTICE UPDATE
FEE. Any person submitting an updated notice, as required by s.
NR 447.07(2), for an asbestos renovation
or demolition activity when the amount of affected asbestos changes by at least
20% shall pay a fee of $100.