Current through August 26, 2024
(1) GENERAL.
(a) An approved mitigation bank instrument is
the record of department and interagency review team concurrence on the
objectives and administration of a mitigation bank. The secretary or the
secretary's designee shall sign for the department and this signature on the
mitigation bank instrument constitutes department approval of the
bank.
(b) A mitigation bank sponsor
is responsible for establishing a mitigation bank site in accordance with an
approved mitigation bank instrument, administration of the accounting of debits
and credits, conducting required corrective actions, providing required
monitoring and status reports to the department, and assuring long-term
maintenance and protection of the site. A mitigation bank sponsor may request
that the department include more than one compensation site in a mitigation
bank instrument.
(c) Participation
in the establishment of a mitigation bank does not constitute ultimate
authorization for specific activities, as excepting the activities from any
applicable requirements, or as pre-authorizing the use of credits from that
bank for any activity.
(d) By
January 30 of each year that a mitigation bank is in operation, the mitigation
bank sponsor shall provide a report to the department that provides an
accounting of credits and debits using the format described in the mitigation
bank instrument under sub. (3) (i).
(2) CONSTRUCTION MONITORING.
(a) The mitigation bank sponsor shall inform
the department of the progress of construction and shall provide full access to
the department for site inspections.
(b) The mitigation bank sponsor shall receive
written approval from the department before implementing any substantial
deviations from the approved compensation site plan.
(c) The mitigation bank sponsor shall provide
an as-built report to the department to verify that the project was completed
in accordance with the approved plans and specifications. This report shall
summarize the construction activities, note any changes to the construction
plan that occurred, and provide as-built plan sheets of the site. The as-built
report shall be organized according to the following outline:
1. Site identification. Include the bank name
or permit number, designer or consultant, and sponsor. Include a written
description of the location, such as landmarks, perimeter information, and
coordinates.
2. Identification of
the construction contractor.
3.
Dates of construction, seeding and planting, completion, and site inspections
by a qualified wetland consultant.
4. Description of any changes to the original
plan.
5. Description of any
problems encountered during construction and actions taken to correct the
problems.
6. List of follow-up
corrective actions needed, schedule for corrective actions, and persons
responsible for corrective actions.
7. As-built plan sheets.
8. Photos showing before and after conditions
of the constructed area.
9.
Description of the existing conditions of all wetlands at the completion of
construction activities.
10. A
credit release request, as specified in the project's compensation site
plan.
(d) A final
construction inspection may be conducted by the department after receipt of the
as-built report under par. (c) to determine whether the site was built in
accordance with plans and specifications.
(e) If the department determines that
corrective actions are needed to bring the site into compliance with the
compensation site plan, the department shall provide the mitigation bank
sponsor a list of corrective actions to be completed by a specific
date.
(f) The applicant or bank
sponsor shall certify to the department evidence that all corrective actions
identified under par. (e) have been addressed.
(g) The department shall issue a letter of
compliance through email or mail after the department determines that
construction and all corrective actions are complete.
(h) After the department issues a letter of
compliance, the mitigation bank sponsor shall request the department to
reevaluate the amount of required financial assurance.
(3) POST CONSTRUCTION MONITORING.
(a) The purpose of post construction
monitoring is to do all of the following:
1.
Determine whether performance standards established for the site under s. NR 350.007(6) (i) are being met.
2.
Identify trends in wetland functions at the site.
3. Identify the need for corrective
actions.
(b) The
department will evaluate the site against the established performance standards
described in the project's approved compensation site plan in s. NR 350.007(6)
(i).
(c) A monitoring plan shall
take into consideration unique aspects of the site.
(d) A monitoring plan shall include a
monitoring schedule of adequate frequency and duration to measure specific
performance standards and to assure long-term success of the stated goals for
the site.
(e) A monitoring plan
shall be sufficient to assess trends in wetland function at the site and the
degree to which the performance standards for the site are met.
(f) A mitigation bank sponsor shall provide a
monitoring report to the department as agreed upon in the approved compensation
site plan.
(g) A minimum of 5
monitoring reports shall be required during the monitoring period and a
mitigation bank sponsor may submit additional monitoring reports if performance
standards are not met in the number of monitoring years as approved in the
final mitigation bank instrument.
(h) Monitoring shall occur for the length of
time specified in the approved compensation site plan under s. NR 350.007(6)
(k). The monitoring period for restoration, enhancement, or creation activities
will be required for no fewer than 5 years for all wetland communities. Shrub
and wooded wetland communities, and wetland types that are more difficult to
restore, such as bog or fen wetlands, may require more than 5 years of
monitoring to meet performance standards, become successfully established on a
site, or both. The length of the required monitoring period for each vegetation
community will be based on the performance standards developed in the approved
compensation site plan. The department may extend the length of the monitoring
period if the site does not meet performance standards in the monitoring time
frame listed in the approved compensation site plan.
(i) Monitoring report requirements shall
include all of the following:
1. A restatement
of the compensation site plan goals, objectives, and performance
standards.
2. Identification of any
structural failures or external disturbances on the site.
3. A description of management activities and
corrective actions implemented on the site during the past year.
4. A summary of and full presentation of the
data collected during the past year.
5. A site map showing the locations of data
collection by each vegetation community survey method and the locations of
monitoring wells.
6. An assessment
of the degree to which performance standards are being met.
7. Proposed corrective actions to improve
attainment of performance standards.
8. A narrative summary of the results and
conclusions of the monitoring.
9.
Any proposed credit releases, as outlined in the site's approved compensation
site plan.
(j) If after
review of the monitoring report, the department identifies conditions that
indicate a site is unlikely to meet performance standards, the department may
require corrective actions to the sponsor that may allow the mitigation site to
meet the performance standards as agreed upon in the mitigation bank
instrument.
(k) At the end of the
monitoring period, the department shall provide a final letter of compliance by
email or mail if the department determines that the site is successful and
established.
(l) After the
department issues a final letter of compliance, the department shall release
financial assurances as appropriate.
(4) CREDIT RELEASE REQUESTS AND APPROVAL.
(a) As part of an as-built report under sub.
(2) (c) and as part of a monitoring report under sub. (3) (h) a mitigation bank
sponsor may submit a credit release to the department when performance
standards have been achieved according to the mitigation bank
instrument.
(b) A credit release
request shall include all of the following:
1.
Documentation that appropriate milestones and performance standards have been
achieved, as described in s. NR 350.008(2).
2. An explanation of any previous credit
releases that have been granted to the mitigation bank, including the amount of
credits released and when those credits were released.
(c) Within 45 days of receiving or within 30
days after a necessary site visit has been completed, the department shall
provide a recommendation by email or mail to the U.S. army corps of engineers
on whether or not to release credits. The department may recommend releasing
partial credit if the performance standards in question have only been achieved
in part.
Note: Should the U.S. army corps of engineers'
review of credit release requests extend beyond the stated timeline, the
department's comments may be subsequently delayed in reaching a mitigation bank
sponsor.
(5)
ADAPTIVE MANAGEMENT AND INSTRUMENT MODIFICATION.
(a) The mitigation bank sponsor may request
to use the adaptive management plan described in s. NR 350.007(6) in the event
that the site or an area of the site is developing differently than designed
and may adversely affect the success of the mitigation bank.
(b) Prior to completing adaptive management
strategies that would result in wetland functions that are not comparable to
those described in the mitigation bank's approved compensation site plan, such
as but not limited to filling, grading, exaction, or hydrologic manipulations,
the mitigation bank sponsor shall provide all of the following information to
the department:
1. The issue that requires an
adaptive management strategy.
2.
The adaptive strategy that will be used to rectify the issue, including when
and how the adaptive management strategy will be implemented.
3. The expected outcome of the adaptive
management strategy.
(c)
If the adaptive management strategy involves activities such as but not limited
to excavation or hydrologic manipulations, or will result in wetland functions
that are not comparable to those described in the mitigation bank's approved
compensation site plan, the department may require a mitigation bank instrument
modification. If required, a mitigation bank instrument modification shall
include all of the following:
1. Revised
performance standards based on the anticipated adaptive management
outcome.
2. Revised credit
allocations based on the anticipated adaptive management outcome.
3. A revised credit release schedule based on
the anticipated adaptive management outcome.
4. A revised long-term management plan based
on the anticipated adaptive management outcome.
(d) The department's completion of a modified
bank instrument review shall be dependent upon whether the modification
qualifies as a standard or streamlined review.
(e) The department may use a streamlined
review for the following instrument modifications:
1. A request for a greater or lesser amount
of credits for a mitigation project.
2. A request for a change to a credit release
schedule.
3. Any other request for
a change that the department deems appropriate.
(f) The department shall complete a
streamlined instrument modification review within 60 days of receipt of such a
request. The department shall either recommend to approve the streamlined
modification request, recommend to deny the streamlined modification request,
or provide information to the mitigation bank sponsor explaining the
information needed to make the streamlined modification request
approvable.
(g) The department
shall use a standard modification review process for all requests that do not
meet the standards listed in par. (e).
(h) A standard instrument modification review
shall follow the process outlined in s. NR 350.008(1).
Note: As an interagency review team member, the
department will review standard and streamlined instrument modification
submittals according to the timelines stated above and will issue its
recommendations to the U.S. army corps of engineers. Should the U.S. army corps
of engineers' review of these requests extend beyond the stated timelines, the
department's comments may be subsequently delayed in reaching a mitigation bank
sponsor.
(6)
LONG-TERM MANAGEMENT.
(a) The party
responsible for the site's long-term management shall follow the long-term
management plan per the approved compensation site plan described in s. NR 350.007(6) to ensure the mitigation bank's long-term sustainability.
(b) The party responsible for the site's
long-term management shall fund the long-term management plan per the approved
compensation site plan described in s. NR 350.007(6) to ensure the mitigation
bank's long-term sustainability.