Wisconsin Administrative Code
Department of Natural Resources
NR 300-399 - Environmental Protection - Water Regulation
Chapter NR 341 - Grading On The Bank Of Navigable Waterways
Section NR 341.06 - Stormwater management plan requirements
Current through November 25, 2024
Pollution caused by stormwater discharges from the grading site after construction is completed, including rooftops, parking lots, roadways and the maintenance of grassed areas, shall be addressed by a stormwater management plan. Any person required to submit an application for a grading permit under this chapter shall develop one of the following site specific stormwater management plans:
(1) SITES GREATER THAN ONE ACRE OF LAND DISTURBANCE. A stormwater management plan shall be developed in accordance with s. NR 216.47 prior to submitting an application for a grading permit to the department. The plan shall be implemented upon final stabilization of the grading site.
(2) SITES LESS THAN ONE ACRE OF LAND DISTURBANCE. A stormwater management plan shall, to the maximum extent practicable, direct runoff from impervious surfaces onto pervious surfaces. Examples may include directing downspouts onto lawns and away from pavement, driveways sloped onto lawns, and avoidance of piping or channelizing flow from impervious areas into waters of the state. The plan shall be implemented upon final stabilization of the grading site.