Wisconsin Administrative Code
Department of Natural Resources
NR 200-299 - Environmental Protection - Wisconsin Pollutant Discharge Elimination System
Chapter NR 212 - Waste Load Allocated Water Quality Related Effluent Limitations
Subchapter II - Effluent Limitations for Biochemical Oxygen Demand Developed Through Wasteload Allocations for Specific Stream Segments
Section NR 212.12 - Instream aeration
Current through August 26, 2024
(1) Total maximum loads established under this chapter may be calculated based on the use of instream aeration techniques when WPDES permit applications meet both the following conditions:
(2) Instream aeration may not be used to accommodate new or increased discharges of pollutants either from new point sources or from the expansion of existing point sources, except that instream aeration may be available on a temporary basis to accommodate increased pollution loads due to the growth of a municipality when:
(3) The use of instream aeration under sub. (2) shall be allowed for a period not to exceed 5 years, at which time the publicly-owned point source shall have sufficient treatment capability in place to meet the waste water treatment needs as required by an approved municipal waste water treatment facility plan developed under ch. NR 110.