(1) Each financial assistance agreement shall require the recipient to do all of the following:
(a) Maintain a system of user charges and a
sewer use ordinance in accordance with s.
NR 162.07 for the useful life of the treatment works or
BMP.
(b) Comply with all pertinent
requirements of federal, state, and local environmental laws and
regulations.
(c) For financial
assistance provided directly from a federal capitalization grant, comply with
the requirements contained in
33 USC
1251 to
1274 and
33 USC
1381 to
1387 if required by the terms of
the capitalization grant.
(d)
Provide timely sewerage service to all users of the treatment works within the
delineated service area except in areas where annexation is refused under s.
281.43 (1m),
Stats.
(e) Comply with all state
and local laws regarding procurement and public contracts.
(f) Provide department representatives access
to the scored project, including all construction activities, whenever the
project is in preparation or progress. For purposes of providing access, the
recipient shall do all of the following:
1.
The recipient shall in each of its contracts for the project include a
provision that requires the recipient and its contractors to allow the
department access to records of contractors and subcontractors pertinent to the
project for the purpose of making inspections, examinations, excerpts, copies,
and transcriptions.
2. The
recipient shall allow DOA or its agent access to records for audits.
(g) Expeditiously initiate and
complete the project in accordance with the financial assistance agreement and
application, including construction of and payments for the portions ineligible
for CWFP financial assistance and any project schedule approved by the
department. Failure of the recipient to promptly initiate project work may be
deemed a breach of the financial assistance agreement.
(h) Promptly notify the department of changes
to the project, including notifying a department plan reviewer and the
department construction management engineer when plans and specifications are
being revised.
(i) Promptly submit
to the department a copy of any prime contract or modification to it and any
revisions to plans and specifications.
(j) Begin repayment of the principal balance
of the loan no later than 12 months after the substantial completion date of
the project as specified in the financial assistance agreement, and make the
final principal payment no later than 20 years after the date of the financial
assistance agreement unless the financial assistance agreement term is greater
than 20 years but not more than 30 years. If the loan term is greater than 20
years, the municipality shall make the final principal payment no later than 30
years after the date of the financial assistance agreement.
(k) Make available an operations and
maintenance manual for the treatment works. All of the following apply to the
provision of an operations and maintenance manual:
1. A recipient shall develop a new or modify
an existing operations and maintenance manual that, based on the scored
project, is applicable to any of the following:
a. The entire wastewater treatment
works.
b. The collection system,
including all wastewater treatment works facilities outside of the fence of the
wastewater treatment plant.
c. The
wastewater treatment plant, including all wastewater treatment works facilities
inside the fence of the wastewater treatment plant.
2. Address in the manual developed or
modified under subd. 1. all of the following:
a. General information.
b. Staffing.
c. Records and recordkeeping.
d. Laboratory.
e. Safety.
f. Utility systems.
g. A description of the process, operations,
and controls.
h.
Maintenance.
i. Sludge
management.
j. Manufacturer's
information.
3. Provide a
copy of the operations and maintenance manual developed or modified under subd.
1. to the department. For projects or facilities that have an existing
operations and maintenance manual that was submitted to the department in the
past, the recipient may meet the requirements of subds. 1. to 3. by developing
and submitting an addendum to the previously submitted manual.
4. Certify to the department, in the form
required by the CWFP, that the operations and maintenance manual developed or
modified under subd. 1. meets or exceeds the requirements under subd. 2. The
project engineer and a municipal official of the recipient municipality shall
make the certification required under this paragraph.
Note: Operations and maintenance manual certification checklists and additional information regarding operations and maintenance manual requirements are available on the environmental improvement fund website at https://dnr.wisconsin.gov/aid/documents/EIF/Guide/Opmancwf.html.
(L) Provide and maintain
adequate construction inspection to ensure conformance with the approved plans
and specifications.
(m) Comply with
requirements established under s.
281.49, Stats., regarding
accepting septage into the wastewater treatment works from septic tanks or
holding tanks within the recipient's sewer service area.
(n) Notify the department of the substantial
completion of the project.
(o)
Maintain all required intermunicipal agreements throughout the term of the
financial assistance agreement as described in s.
NR 162.05 (4) (h)
2.
(p) Comply with all applicable provisions of
any outstanding CWFP and safe drinking water loan program financial assistance
agreements and CWFP interest rate subsidy agreements.
(q) Obtain and maintain full legal right and
authority required to own, control, operate, and maintain the project for at
least the term of the financial assistance agreement, including assuring that
any of the following requirements regarding the land on which the project takes
place are met:
1. If the municipality prior to
signing a financial assistance agreement owns all of the land on which the
project takes place, the municipality shall maintain ownership of the land on
which the project is built for at least the term of the financial assistance
agreement unless the municipality obtains approval from the department to
discontinue operation of, sell, or otherwise dispose of the project.
2. If the municipality prior to signing a
financial assistance agreement does not own any of the land on which the
project takes place, the municipality shall obtain and maintain for at least
the term of the financial assistance agreement all necessary permits, licenses,
easements, and approvals required to give the municipality the authorities and
permissions needed to construct, operate, and maintain the project on the land
on which the project is built unless the municipality obtains approval from the
department to discontinue operation of, sell, or otherwise dispose of the
project.
3. If the municipality
prior to signing a financial assistance agreement owns some but not all of the
land on which the project takes place, the municipality shall follow the
requirements under subds. 1. and 2. regarding maintaining ownership of or
access needed to the land on which the project takes place to allow the
municipality to construct, operate, and maintain the project on the land on
which the project is built for at least the term of the financial assistance
agreement.
(2) The financial assistance agreement is not effective until all parties to the financial assistance agreement have signed it.
Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.