Wisconsin Administrative Code
Department of Natural Resources
NR 100-199 - Environmental Protection General
Chapter NR 151 - Runoff Management
Subchapter III - Non-Agricultural Performance Standards
Section NR 151.123 - Peak discharge performance standard

Current through August 26, 2024

(1) REQUIREMENT. By design, BMPs shall be employed to maintain or reduce the 1-year, 24-hour and the 2-year, 24-hour post-construction peak runoff discharge rates to the 1-year, 24-hour and the 2-year, 24-hour pre-development peak runoff discharge rates respectively, or to the maximum extent practicable. The runoff curve numbers in Table 2. shall be used to represent the actual pre-development condition.

Table 2. Maximum Pre-Development Runoff Curve Numbers

Runoff Curve Number

Hydrologic Soil Group

A

B

C

D

Woodland

30

55

70

77

Grassland

39

61

71

78

Cropland

55

69

78

83

Note: Where the pre-development condition is a combination of woodland, grassland, or cropland, the runoff curve number should be pro-rated by area.

(2) EXEMPTIONS. This section does not apply to the following:

(a) A post-construction site where the discharge is directly into a lake over 5,000 acres or a stream or river segment draining more than 500 square miles.

(b) Except as provided under s. NR 151.121(5), a redevelopment post-construction site.

(c) An in-fill development area of less than 5 acres.

The intent of s. NR 151.123 is to minimize streambank and shoreline erosion under bank-full conditions.

Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.