Wisconsin Administrative Code
Department of Natural Resources
NR 100-199 - Environmental Protection General
Chapter NR 151 - Runoff Management
Subchapter I - General Provisions
Section NR 151.003 - BMP Location
Current through August 26, 2024
(1) NON-NAVIGABLE WATERS. For purposes of determining compliance with the performance standards of subchs. III and IV, the department may give credit for BMPs that function to provide treatment for runoff from existing development and post-construction runoff from new development, redevelopment, and in-fill development and that are located within non-navigable waters.
(2) NAVIGABLE WATERS.
Note: An intermittent waterway may be identified on a United States geological survey 7.5-minute series topographic map, a county soil survey map, the Surface Water Data Viewer Map, 24K hydro layer on the department's website, or determined by the department through a site evaluation, whichever is more current. The Surface Water Data Viewer Map, 24K hydro layer is available at http://dnr.wi.gov/topic/surfacewater/swdv/.
(3) CREDIT. The amount of credit that the department may give a BMP for purposes of determining compliance with the performance standards of subchs. III and IV is limited to the treatment capability of the BMP.
This section does not supersede any other applicable federal, state, or local regulation such as ch. NR 103 or ch. 30, Stats. Federal, state, and local permits or approvals may be required to excavate, dredge, fill, or construct BMPs in or near wetlands, non-navigable or navigable waters. Other permits and approvals may not be authorized where the BMP construction will result in adverse environmental impacts to the waterway or wetland.