(1) GENERAL. Tank systems that are abandoned with or without product shall be closed within 60 days of non-compliance with s. ATCP 93.545 or in-use tank system requirements.
(2) EXCEPTIONS. Abandoned tank systems that are less than 30 years old or of double-wall construction may be returned to service if they all of the following conditions:
(a) Apply for permits to operate in
accordance with s.
ATCP 93.145.
(b)
1. The
integrity of a fiberglass tank shall be assessed and certified by the
manufacturer or a qualified professional engineer. The assessment shall include
an internal inspection and certification that the tank is suitable for
continued service.
2. The integrity
assessment of a steel tank shall be performed in accordance with API 1631.
a. Tanks that have an overall average tank
metal thickness or an average tank thickness of a designated thin wall area of
less than 75 percent or any through-wall perforations shall be immediately
closed per s.
ATCP 93.560.
b.
Tanks that have an overall average tank metal thickness or an average tank
thickness of a designated thin wall area of 75 percent to 85 percent shall have
an impressed current system installed per s.
ATCP 93.520 or be immediately closed per s.
ATCP 93.560.
c.
The certification and report of the assessment shall be submitted to the
department for approval prior to adding product to the
tank.
3. Cathodically
protected tanks shall meet the requirements of s.
ATCP 93.520.
4.
Precision testing of the entire tank system without product shall be performed
per s.
ATCP 93.515(4) by a certified tank system
tightness tester.
5. A complete
underground tank system functionality verification shall be conducted per s.
ATCP 93.510(2). Form TR-WM-139 documenting
the verification shall be submitted to the department.
6. The tank system shall fully comply with
this chapter before being placed back into service, except double-wall
construction is not newly required for tank systems installed before February
1, 2009.
7. The tank system shall
pass a department storage tank system inspection conducted in accordance with
this chapter.
Disclaimer: These regulations may not be the most recent version. Wisconsin may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.