Wisconsin Administrative Code
Department of Agriculture, Trade and Consumer Protection
ATCP 20-54 - Agricultural Resource Management
Chapter ATCP 48 - Drainage districts
Subchapter IV - District Map, Drains and Corridors
Section ATCP 48.24 - District corridors
Current through February 24, 2025
(1) CORRIDOR REQUIRED. A county drainage board shall establish and maintain a district corridor around every district ditch. The county drainage board shall maintain the district corridor, in compliance with this subchapter, for all of the following purposes:
(2) WIDTH OF CORRIDOR. A district corridor shall extend for 20 feet from the top of the ditch bank on each side of a district ditch. A county drainage board may, by giving specific notice to landowners, establish a wider corridor if necessary to permit vehicle access or to protect water quality in the district ditch.
Note: Under s. ATCP 48.28, a county drainage board is required to control the growth of woody vegetation in a district corridor, except that a county drainage board may allow the growth of woody vegetation in portions of a district corridor if it does not interfere with effective access to district drains.
(3) ACCESS TO CORRIDOR. Except as provided under sub. (4), a member of a county drainage board or an employee or other authorized agent of a county drainage board may, without prior notice to a landowner, do any of the following:
(4) NOTICE OF ACTIVITIES IN THE CORRIDOR. Before a county drainage board or its agent does either of the following in a district corridor, the county drainage board or its agent shall notify the landowner by one of the methods specified under s. ATCP 48.22(5):
(5) ROW CROPPING AND OBSTRUCTIONS IN DISTRICT CORRIDOR.
Note: In deciding whether to authorize row cropping in a district corridor, a county drainage board should consider whether that row cropping will increase maintenance requirements, soil erosion, or movement of suspended solids to district drains. It may consider relevant factors such as the type of row cropping and tillage proposed, the topography of the district corridor, and the type, quality and character of the soil and subsoil in the district corridor.
See s. ATCP 48.28 related to the control of woody vegetation in a district corridor.