(1) "Total system price" includes only the renewable energy system components and fees that are integral and necessary for the generation of electricity. Components and fees include:
(a) Renewable energy system equipment
(depends on system type):
(i) Solar energy
system: Solar modules, inverter(s);
(ii) Wind generator: Turbine(s), tower(s),
inverter(s);
(iii) Anaerobic
digester: Digester/reactor, electrical generator.
(b) Balance of system (such as racking,
wiring, switch gear, meter base);
(c) Nonhardware costs incurred up to the date
of the final electrical inspection (such as fees associated with engineering,
permitting, interconnection, application);
(d) Labor;
(e) Sales tax (as applicable).
(2) Total system price does not include structures and fixtures that are not integral and necessary to the generation of electricity, such as carports, roofing, and energy storage.
Disclaimer: These regulations may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.