Washington Administrative Code
Title 332 - Natural Resources, Board and Department of (See also Title 222)
Chapter 332-14 - Coal leasing rules and regulations
Section 332-14-170 - Plan of activities - Coal option contract

Universal Citation: WA Admin Code 332-14-170

Current through Register Vol. 24-18, September 15, 2024

The applicant for a coal option contract shall submit a plan of activities which shall include but is not limited to the following:

(1) The type, location, and schedule of exploratory drilling and trenching activities;

(2) Location of other significant activities, including type and depth of drilling, trenching, and adit construction;

(3) Proposed roads;

(4) Reclamation, including method of plugging and sealing drill holes and adits;

(5) Proposed erosion control plans for roads, landings, drilling platforms, and trenches; and

(6) Proximity to surface water including proposed stream crossings.

If the holder of a coal option contract desires changes to the approved plan of activities, department approval is required.

Statutory Authority: RCW 79.01.668. 85-10-040 (Order 443), § 332-14-170, filed 4/29/85.

Disclaimer: These regulations may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.