Washington Administrative Code
Title 296 - Labor and Industries, Department of
Chapter 296-45 - Electric power generation, transmission, and distribution
Section 296-45-67537 - Sling and rigging
Current through Register Vol. 24-06, March 15, 2024
(1) The pilot is responsible for the integrity of the rigging for any external load and must ensure safe delivery of the cargo by inspecting and monitoring the security of the rigging throughout the operation. Prior to operations, the pilot must check the condition and application of all rigging gear to ensure serviceability. Prior to commencing operations, determine the complete rigging requirements, including slings and taglines.
(2) All personnel involved with rigging activities must receive appropriate rigging training and show proficiency specific to helicopter operations and the work or tasks being performed.
(3) The slings used for the external load must be inspected each day before use. Slings must be inspected by an employee designated, trained and qualified as a rigger.
(4) No sling will be used unless it has a properly marked minimum tensile strength of five times the load which will be carried or is being carried.
Order 76-38, § 296-45-67537, filed 12/30/76.