Washington Administrative Code
Title 296 - Labor and Industries, Department of
Chapter 296-127 - Prevailing wage
Section 296-127-01358 - Pile drivers

Universal Citation: WA Admin Code 296-127-01358
Current through Register Vol. 24-06, March 15, 2024

For the purpose of the Washington state public works law, chapter 39.12 RCW, the work of a pile driver includes, but is not limited to:

Pile driver (pile buck).

* The preparation, aligning, plumbing, setting, stressing, testing, pulling, welding, cutting off and capping of piling of any type including steel pile and concrete pile and the splicing, barking, heading and shoeing of piling and the rigging and signaling connected with all of the above.

* Operating engineer pile driver.

* Operating any power equipment used for pile driving, such as cranes equipped with drophammers and drums and hoists on A-frame type fixed leads on floating rigs.

Statutory Authority: Chapter 39.12 RCW, RCW 43.22.270 and 43.22.051. 00-15-077, § 296-127-01358, filed 7/19/00, effective 7/19/00.

Disclaimer: These regulations may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.