Washington Administrative Code
Title 246 - Health, Department of
WATER SYSTEMS
Chapter 246-293 - Water System Coordination Act
Part I - PROCEDURAL REGULATIONS
Section 246-293-230 - Coordinated water system plan - Water system plan
Current through Register Vol. 24-18, September 15, 2024
(1) Each purveyor within the external critical water supply service area boundaries shall be responsible for completion of a water system plan for the purveyor's future service area, including provisions of WAC 248-56-730, if such a plan has not already been approved, with the following exception:
Note: |
If the county legislative authority permits a change in development that will increase the demand for water service of such a system beyond the existing system's ability to provide minimum water service, the purveyor shall develop a water system plan in accordance with this section. |
(2) Each purveyors' water system plan shall be updated at the time the coordinated water system plan is prepared, which will eliminate the necessity of updating the water system plan prior to the mandatory five year update of the coordinated water system plan.
(3) The content of a water system plan shall be consistent with WAC 248-54-580 and shall comply with guidelines* which may be obtained from the department. These guidelines have been compiled to further assist in meeting the purpose of this chapter, and address three levels of planning requirements varying in detail, based upon the size of the public water system.
Statutory Authority: RCW 43.70.040. 91-02-049 (Order 121), recodified as § 246-293-230, filed 12/27/90, effective 1/31/91. Statutory Authority: Chapter 70.116 RCW. 78-07-048 (Order 1309), § 248-56-710, filed 6/28/78.