Washington Administrative Code
Title 246 - Health, Department of
WATER SYSTEMS
Chapter 246-292 - Waterworks operator certification
Section 246-292-036 - Backflow preventer inspection and field test report content
Current through Register Vol. 24-18, September 15, 2024
(1) A BAT shall complete a backflow preventer inspection and field test report as required in WAC 246-292-034(3)(c).
(2) The completed backflow preventer inspection and field test report must contain facility and hazard information including:
(3) The completed backflow preventer inspection and field test report must contain backflow prevention assembly or AVB information including:
(4) The completed backflow preventer inspection and field test report must contain installation information including whether or not the backflow prevention assembly or AVB is properly installed:
(5) The completed backflow preventer inspection and field test report must contain results of backflow prevention assembly inspections and field tests conducted according to the field test procedures that meet the requirements of WAC 246-290-490(7)(d), including:
(6) The completed backflow preventer inspection and field test report must contain backflow prevention assembly or AVB maintenance and repair information, if applicable and known to the BAT, including a:
(7) The completed backflow preventer inspection and field test report must contain field test kit information for each field test conducted, including:
(8) The completed backflow preventer inspection and field test report must contain results of air gap inspections including:
(9) The completed backflow preventer inspection and field test report must contain remarks, if applicable, including, but not limited to:
(10) The completed backflow preventer inspection and field test report must contain information about the BAT who inspected, field tested, maintained, or repaired the backflow preventer, including the BAT's:
(11) The completed backflow preventer inspection and field test report must contain the date of each inspection, field test, maintenance or repair, if applicable, performed by the BAT.
(12) The completed backflow preventer inspection and field test report must contain a statement certifying that the BAT:
(13) The completed backflow preventer inspection and field test report must contain the signature of the BAT who inspected, field tested, maintained, or repaired the backflow preventer. The signature must be in original, copy, facsimile, or electronic format.