Washington Administrative Code
Title 246 - Health, Department of
WATER SYSTEMS
Chapter 246-290 - Group A public water supplies
Part 6 - SURFACE WATER TREATMENT
Subpart A - Introduction and General Requirements
Section 246-290-634 - Follow-up to treatment technique violations
Current through Register Vol. 24-18, September 15, 2024
When a treatment technique violation occurs, the purveyor:
(1) Shall report to the department in accordance with:
(2) Shall notify the public in accordance with Part 7, Subpart A of this chapter;
(3) Shall determine the cause of the violation;
(4) Shall take action as directed by the department which may include conducting a CCP. A CCP may include both a CPE and CTA;
(5) Shall identify and systematically address plant-specific factors identified in the CPE during the CTA, if required; and
(6) May be subject to enforcement under WAC 246-290-050.
Statutory Authority: RCW 43.20.050 and 70.119A.080. 10-20-068, § 246-290-634, filed 9/29/10, effective 11/1/10. Statutory Authority: RCW 43.20.050(2) and (3) and 70.119A.080. 03-08-037, § 246-290-634, filed 3/27/03, effective 4/27/03. Statutory Authority: RCW 43.02.050 [43.20.050]. 99-07-021, § 246-290-634, filed 3/9/99, effective 4/9/99. Statutory Authority: RCW 43.20.050. 93-08-011 (Order 352B), § 246-290-634, filed 3/25/93, effective 4/25/93.