Section 246-272B-05000 - Installer qualifications and responsibilities

Universal Citation: WA Admin Code 246-272B-05000

Current through Register Vol. 24-24, December 15, 2024

The installer shall:

(1) Be currently approved by the local health jurisdiction in the county where the LOSS is to be constructed.

(2) Have the following experience:

(a) Three or more years experience installing OSS; or

(b) A record of successful completion of at least one similar installation, including a pressure distribution drainfield.

(3) Maintain a copy of approved plans and specifications on-site during construction;

(4) Follow the approved plans and specifications or obtain approval from the design engineer prior to making field changes;

(5) Install sewage tanks approved by the department according to the provisions of chapter 246-272C WAC, On-site sewage system tanks;

(6) Be on the site at all times during the excavation and construction of the LOSS;

(7) Backfill and grade the site after construction to prevent surface water from accumulating over any LOSS component; and

(8) Leave the drainfield lines uncovered until the drainfield passes the department's final inspection. Driplines may be covered prior to inspection.

Statutory Authority: RCW 70.118B.020. 11-12-035, § 246-272B-05000, filed 5/25/11, effective 7/1/11.

Disclaimer: These regulations may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.