Washington Administrative Code
Title 246 - Health, Department of
SEWER SYSTEMS
Chapter 246-272B - Large on-site sewage system regulations
Part 2 - APPROVAL AND PERMITTING PROCESS
Subpart A - New Construction
Section 246-272B-02000 - Site review-Predesign report, soil characterization, and site inspection
Current through Register Vol. 24-24, December 15, 2024
(1) The owner proposing a new LOSS shall submit to the department:
(2) After reviewing all submitted information, the department shall provide a written notice of determination to the owner.
(3) Upon receiving the notice to proceed, the owner may proceed with the site inspection. To proceed, the owner shall:
(4) After receiving the fee, the department shall inspect the proposed LOSS site with the design engineer and the person who prepared the soil logs, if different than the design engineer, to:
(5) After reviewing all submitted information, the department shall provide a written notice of determination to the owner.
Statutory Authority: RCW 70.118B.020. 11-12-035, § 246-272B-02000, filed 5/25/11, effective 7/1/11.