Washington Administrative Code
Title 246 - Health, Department of
RECREATIONAL WATER
Chapter 246-260 - Water recreation facilities
Section 246-260-021 - Construction permit
Current through Register Vol. 24-18, September 15, 2024
(1) Prior to construction, alteration or modification of a WRF pool, except for routine maintenance, an owner shall obtain a construction permit. In order to obtain a construction permit, the owner shall submit a completed application package to the department or local health officer for review and approval. The application package shall include:
(2) Plans must be drawn to scale and in sufficient detail to completely illustrate that construction is in compliance with this chapter. The plans shall include:
(3) Only applications and plans that the department or local health officer determines are complete may be considered for permit approval or denial. The department or the local health officer shall approve or deny a complete application within thirty days.
(4) Owners may submit a construction permit application proposing a WRF that incorporates innovative design features not specifically covered by these regulations or chapter 246-262 WAC. At least thirty days prior to development of final plans and specifications, the owner shall present their proposal at a preliminary design conference with the department or local health officer. The owners or their architects or engineers shall address the health and safety issues, including maintenance and operation of the proposed innovative design, and good engineering practice. The department or local health officer may require additional information and additional review or justification by a safety engineer or other qualified individual before approving or denying the application. An application for a construction permit for a water recreation facility may not be approved unless, notwithstanding a noncompliant design, the health and safety purposes behind the requirements of this chapter would be met. An applicant (or the architect or engineer acting on behalf of the applicant) shall provide adequate documentation to meet these requirements including, but not limited to:
(5) Owners shall ensure any WRF construction, modification, or alteration is completed according to approved plans and specifications.
(6) Upon completion of WRF construction, modification, or alteration and before an operating permit is issued, owners shall:
(7) The construction permit issued by the department or local health officer is valid eighteen months. The department or local health officer may grant construction permit renewals which are valid for one year. The owner is responsible to resubmit for a reapplication for a construction permit.
Statutory Authority: Chapters 70.90 and 43.20 RCW. 04-18-096, § 246-260-021, filed 9/1/04, effective 10/31/04.