(1) Any new major stationary source located anywhere in a nonattainment area designated under section 107(d)(1)(A)(i) of the Federal Clean Air Act, that is major for the pollutant for which the area is designated nonattainment is subject to the permitting requirements of WAC 173-400-830 through 173-400-850. Any major modification of an existing major stationary source that is major for the pollutant for which the area is designated nonattainment and is located anywhere in a nonattainment area designated under section 107(d)(1)(A)(i) of the Federal Clean Air Act, and that has a significant net emissions increase of the pollutant for which the area is designated nonattainment is subject to the permitting requirements of WAC 173-400-830 through 173-400-850. A modification to an existing major stationary source must use the following procedures to determine if the modification would result in a significant net emissions increase of the nonattainment pollutant.
(2) Except as otherwise provided in subsection (4) of this section, and consistent with the definition of major modification, a project is a major modification for a regulated NSR pollutant if it causes two types of emissions increases - A significant emissions increase, and a significant net emissions increase. The project is not a major modification if it does not cause a significant emissions increase. If the project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase.
(3) The procedure for calculating (before beginning actual construction) whether a significant emissions increase (i.e., the first step of the process) will occur depends upon the type of emissions units being modified, according to (a) through (c) of this subsection. For these calculations, fugitive emissions (to the extent quantifiable) are included only if the emissions unit is part of one of the source categories listed in the definition of major stationary source contained in WAC 173-400-810(14)(e) or if the emissions unit is located at a major stationary source that belongs to one of the listed source categories. Fugitive emissions are not included for those emissions units located at a facility whose primary activity is not represented by one of the source categories listed in the definition of major stationary source contained in WAC 173-400-810(14)(e) and that are not, by themselves, part of a listed source category. The procedure for calculating (before beginning actual construction) whether a significant net emissions increase will occur at the major stationary source (i.e., the second step of the process) is contained in the definition of net emission increase. Regardless of any such preconstruction projections, a major modification results if the project causes a significant emissions increase and a significant net emissions increase.
(4) Any major stationary source which has a PAL for a regulated NSR pollutant shall comply with requirements in WAC 173-400-850.
(5) The following specific provisions apply with respect to any regulated NSR pollutant emitted from projects at existing emissions units at a major stationary source (other than projects at a source with a PAL) in circumstances where there is a reasonable possibility that a project that is not a part of a major modification may result in a significant emissions increase of such pollutant, and the owner or operator elects to use the method specified in the definition of projected actual emissions contained in WAC 173-400-810(23)(b)(i) through (iii) for calculating projected actual emissions.
(6) For projects not required to submit the above information to the permitting authority as part of a notice of construction application, the owner or operator of the source shall make the information required to be documented and maintained pursuant to subsection (5) of this section available for review upon a request for inspection by the permitting authority or the general public pursuant to the requirements contained in chapter 173-401 WAC.