Current through Register Vol. 41, No. 3, September 23, 2024
A. The following permit revisions are, at the option of the designated representative submitting the permit revision, either fast-track modifications under this section or permit modifications for affected units under 9VAC5-80-600:
1. Incorporation of a compliance option under
9VAC5-80-450
that the designated representative did not submit for approval and comment
during the permit issuance process; except that incorporation of a reduced
utilization plan that was not submitted during the permit issuance process,
that does not designate a compensating unit, and that meets the requirements of
40 CFR
72.43 may use the administrative permit
amendment procedures under
40 CFR
72.83.
2. Changes in a substitution plan or reduced
utilization plan that result in the addition of a new substitution unit or a
new compensating unit under the plan.
3. Addition of a nitrogen oxides averaging
plan to a permit.
4. Changes in a
Phase I extension plan, repowering plan, nitrogen oxides averaging plan, or
nitrogen oxides compliance deadline extension; and
5. Changes in a thermal energy plan that
result in any addition or subtraction of a replacement unit or any change
affecting the number of allowances transferred for the replacement of thermal
energy.
B. The following requirements apply with respect to service, notification, and public participation:
1. The designated
representative shall serve a copy of the fast-track modification on the
following at least five days prior to the public comment period specified in
subdivisions 2 and 3 of this subsection:
a.
The administrator;
b. The
department;
c. Affected states;
and
d. Persons on a permit mailing
list who have requested information on the opportunity for public
comment.
2. Within five
business days of serving copies of the fast-track modification under
subdivision 1 of this subsection, the designated representative shall give
public notice of the fast-track modification by publication in a newspaper of
general circulation in the area where the source is located or in a state
publication designed to give general public notice. The notice shall contain
the information listed in
9VAC5-80-670
C 1 a through C 1 h. The notice shall also state that a copy of the fast-track
modification is available (i) from the designated representative and (ii) for
public inspection during the entire public comment period at the regional
office.
3. The public shall have a
period of 30 days, commencing on the date of publication of the notice, to
comment on the fast-track modification. Comments shall be submitted in writing
to the department and to the designated representative.
C. The timetable for issuance shall be as follows:
1. Within 30 days of the close of the
public comment period, the department shall consider the fast-track
modification and the comments received and approve, in whole or in part or with
changes or conditions as appropriate, or disapprove the modification.
2. A fast-track modification shall be
effective immediately upon approval and issuance, in accordance with
9VAC5-80-510
B 5.
Statutory Authority: § 10.1-1308 of the Code of Virginia.
Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.