Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 91 - FACILITY AND ABOVEGROUND STORAGE TANK (AST) REGULATION
Part II - Registration, Notification and Closure Requirements
Section 9VAC25-91-110 - Notifications

Universal Citation: 9 VA Admin Code 25-91-110

Current through Register Vol. 41, No. 3, September 23, 2024

A. An owner or a duly authorized representative of the facility or AST shall notify the department within 30 days after any AST:

1. Upgrade;

2. Major repair;

3. Replacement (i.e., relocating or repositioning of an existing AST); or

4. Change in service (i.e., change in operation, conditions of the stored product, specific gravity, corrosivity, temperature or pressure that has occurred from the original that may affect the tank's suitability for service).

B. Notifications do not require a fee.

Statutory Authority: §§ 62.1-44.15, 62.1-44.34:15, 62.1-44.34:15.1, and 62.1-44.34:19.1 of the Code of Virginia.

Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.