Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 875 - VIRGINIA EROSION AND STORMWATER MANAGEMENT REGULATION
Part V - Criteria and Requirements for Regulated Land-Disturbing Activities
Article 1 - Administrative Criteria
Section 9VAC25-875-535 - Long-term maintenance of stormwater management facilities
Current through Register Vol. 41, No. 3, September 23, 2024
A. The operator shall submit a construction record drawing for permanent stormwater management facilities to the VESMP or VSMP authority based on the locality where the land-disturbing activity will occur. The record drawing shall contain a statement signed by a professional registered in the Commonwealth of Virginia pursuant to Chapter 4 (§ 54.1-400 et seq.) of Title 54.1 of the Code of Virginia, stating that to the best of the professional's knowledge, the construction record drawing shows all adjustments and revisions to the stormwater management plan made during construction and serve as a permanent record of the actual location of all constructed elements.
B. The provision of long-term responsibility for and maintenance of stormwater management facilities and other techniques specified to manage the quality or quantity of runoff is required. Such requirements shall be set forth in an instrument recorded in the local land records prior to permit termination or earlier as required by the authority and shall at a minimum:
C. At the discretion of the VESMP authority, such recorded instruments need not be required for stormwater management facilities designed to treat stormwater runoff primarily from an individual residential lot on which they are located, provided it is demonstrated to the satisfaction of the authority that future maintenance of such facilities will be addressed through an enforceable mechanism at the discretion of the authority.
Statutory Authority: § 62.1-44.15:28 of the Code of Virginia; Chapters 68 and 758 of the 2016 Acts of Assembly.