Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 790 - SEWAGE COLLECTION AND TREATMENT REGULATIONS
Part IV - Reports and Forms
Article 1 - Reports
Section 9VAC25-790-970 - Operational testing and control

Universal Citation: 9 VA Admin Code 9VAC25-790-970

Current through Register Vol. 41, No. 3, September 23, 2024

A. Minimum tests and frequency. Table D-l contains the typical minimum sampling and testing program for operational control of treatment works greater than 40,000 gallons per day.

B. Sampling instructions. The following sampling instructions should be followed when taking samples:

1. When samples are taken for BOD5, COD, volatile suspended solids, and suspended solids on influent and effluent streams, they should be composite samples.

2. All other samples should be grab samples.

TABLE D-1. RECOMMENDED OPERATIONAL AND CONTROL TESTING.
Unit Process Parameters Testing Location/Frequencies (see key for description)
1. Primary
a) DOB5/TSS/TVS 1/bw; 2,3/2
b) settleable solids 2, 3/d
c) pH 2,3,8/d
2. Suspended Growth Reactor
a) BOD5/nutrients 1/bw; 2/w; 3/bw
b) TSS/TVSS 6/d; 13/w
c) 30 minute SSV/pH/DO 6/d
d) microscopic exam. 6/w
3. Attached Growth Reactors
a) BOD5/nutrients 1/bw; 2/w; 3/bw
b) TSS/TVS/microscopic exam. 14/w
c) pH, DO 1/d; 2/w
4. Ponds of Lagoons
a) BOD5/nutrients 1/w; 2/w
b) TSS/microscopic exam. 1/w; 2/w; 7/w
c) pH/DO/temperature 1/d; 7/d
5. Anaerobic Digestion
a) TS/TVS 6,11,12/w; 8,9,10,13/bw
b) pH/alkalinity/temp. 6,12/d; 11,15/bw; 6/w; 13/bw
6. Aerobic Digestion
a) TS/TVS 6,11,12/w; 13/bw
b) settleable solids 6/d
c) pH/temperature 6/d; 15/bw
d) microscopic exam. 6/w; 13/bw
7. Sludge Thickening
a) TS/TVS 1,2/d
b) settleable solids 6/d
8. Sludge Dewatering
a) TS/TVS 1,2,4,12/q
b) pH/alkalinity 15/q
9. Chemical Clarification
a) BOD5/COD/TSS/TYS 1,2/w
pH/alkalinity 1,2,3,4,6/d
b) settleable solids/flocculation 1,2,6/d
c) nutrients 1,2/q
10. Tertiary Filtration
a) BOD5/TSS 1,2/w
b) pH/alkalinity 1,2/d
c) nutrients 1,2/q
TABLE D-1 - KEY
FREQUENCY SAMPLING LOCATION
d - Daily 1. Process Influent
w - Weekly 2. Process Effluents
bw - Biweekly 3. Influent plus Return Waste Streams
q - Daily when in operation 4. Following Chemical Addition
5. Filtered Effluent
CONVENTIONAL PARAMETERS 6. Contents of Reactor
BOD5 - 5-day biochemical oxygen demand 7. All Cells of Each Lagoon or Pond
SS - Suspended solids 8. Raw Sludge
TS - Total solids 9. Primary Sludge
VS - Volatile solids 10. Secondary Sludge
DO - Dissolved oxygen 11. Digester Influent
NUTRIENTS - Forms of phosphorus and nitrogen as required by the certificate CTO issued. 12. Treated Sludge
13. Return Sludge
14. Attached Growth
15. Process Supernatant

Statutory Authority

§ 62.1-44.19 of the Code of Virginia.

Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.