Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 790 - SEWAGE COLLECTION AND TREATMENT REGULATIONS
Part I - Procedural Regulations
Article 2 - Procedures
Section 9VAC25-790-90 - CTC application

Universal Citation: 9 VA Admin Code 9VAC25-790-90
Current through Register Vol. 41, No. 3, September 23, 2024

All applications for a CTC shall be submitted on a form provided by the department and shall be submitted by the owner or authorized agent to the appropriate area engineer as specified at least 30 days of the time an owner desires to be notified of the required procedure for issuance of a CTC, or at least 180 days prior to the date that the owner desires to begin construction. An application for a CTC or a sewerage system shall be accompanied by notification that local government will issue necessary approvals and design data verifying that downstream capacity is available to adequately convey and treat the design flows in accordance with these regulations. An application for a CTC for a sewerage system or treatment works will not be considered complete until evidence is submitted that a complete application has been submitted for a VPDES permit or VPA permit. The owner will be notified by the department within 30 days of receipt of a complete application if a technical evaluation of preliminary or final design documents is required following the preliminary engineering conference, if held.

Statutory Authority

§ 62.1-44.19 of the Code of Virginia.

Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.