Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 580 - UNDERGROUND STORAGE TANKS: TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS
Part V - Release Reporting, Investigation, and Confirmation
Section 9VAC25-580-210 - Release investigation and confirmation steps
Current through Register Vol. 41, No. 3, September 23, 2024
Unless corrective action is initiated in accordance with Part VI (9VAC25-580-230 et seq.) of this chapter, owners and operators must immediately investigate and confirm all suspected releases of regulated substances requiring reporting under 9VAC25-580-190 within seven days, or another reasonable time period specified by the department upon written request made and approved within seven days after reporting of the suspected release.
The following steps are required for release investigation and confirmation:
1. System test. Owners and operators must conduct tests (according to the requirements for tightness testing in subdivision 3 of 9VAC25-580-160 and subdivision 2 of 9VAC25-580-170) or, as appropriate, secondary containment testing described in subdivision 4 of 9VAC25-580-110 .
2. Site check. Owners and operators must measure for the presence of a release where contamination is most likely to be present at the UST site. In selecting sample types, sample locations, and measurement methods, owners and operators must consider the nature of the stored substance, the type of initial alarm or cause for suspicion, the type of backfill, the depth of groundwater, and other factors appropriate for identifying the presence and source of the release. Samples shall be tested according to established EPA analytical methods or methods approved by the department.
Statutory Authority: §§ 62.1-44.15 and 62.1-44.34:9 of the Code of Virginia; 42 USC § 6901 et seq.; 40 CFR Parts 280 and 281.