Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 25 - STATE WATER CONTROL BOARD
Chapter 210 - VIRGINIA WATER PROTECTION PERMIT PROGRAM REGULATION
Part II - VWP Permit Application and Development
Section 9VAC25-210-110 - Establishing applicable standards, limitations, or other VWP permit conditions
Current through Register Vol. 41, No. 3, September 23, 2024
A. In addition to the conditions established in 9VAC25-210-90 and 9VAC25-210-100, and for surface water withdrawals in 9VAC25-210-370, each VWP permit shall include conditions meeting the requirements established in this section where applicable.
B. Water quality standards and state requirements. The VWP permit shall include requirements to comply with all appropriate provisions of state laws and regulations.
C. Toxic pollutants.
D. Monitoring requirements as conditions of VWP permits may include but are not limited to:
E. Best management practices (BMPs). The VWP permit may require the use of BMPs to control or abate the discharge of pollutants.
F. Reissued VWP permits. When a VWP permit is renewed or reissued, limitations, standards, or conditions must be in conformance with current limitations, standards, or conditions.
G. Reopening VWP permits. Each VWP permit shall have a condition allowing the reopening of the VWP permit for the purpose of modifying the conditions of the VWP permit to meet new regulatory standards duly adopted by the board. Cause for reopening VWP permits includes, but is not limited to when the circumstances on which the previous VWP permit was based have materially and substantially changed, or special studies conducted by the department or the permittee show material and substantial change, since the time the VWP permit was issued and thereby constitute cause for VWP permit modification or revocation and reissuance.
Statutory Authority: § 62.1-44.15 of the Code of Virginia; § 401 of the Clean Water Act (33 USC § 1251 et seq.).