Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 20 - VIRGINIA WASTE MANAGEMENT BOARD
Chapter 90 - SOLID WASTE MANAGEMENT PERMIT ACTION FEES AND ANNUAL FEES
Part III - Determination of Fee Amount
Section 9VAC20-90-120 - Permit application fee schedules

Universal Citation: 9 VA Admin Code 20-90-120
Current through Register Vol. 41, No. 3, September 23, 2024

TABLE 3.1-1. NEW OR INITIAL ISSUANCE OR ACTION.

TYPE OF FACILITY

FEE

All landfills:

Part A application

$4,180

Part B application

$18,680

Incineration/Energy Recovery Facility

$5,880

Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility

$4,310

Compost Facility

Facilities Processing Category I Waste

$6,850

Facilities Processing Waste Categories I, II, or III, or Categories III and Lower

$10,550

Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower

$12,670

Experimental Solid Waste Facility

$2,090

Permit-by-rule Initial Review and Confirmation

$390

Emergency Permit

$2,310

TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.

TYPE OF PERMIT MODULE

FEE

Landfill Part A

$4,180

General - Module I

$390

Facility - Module II

$1,310

Landfill - Module III, IV, or V

$7,050

Design plan review

$910

Liner design review

$1,960

Leachate system review

$1,310

Gas management plan review

$1,700

Drainage plan review

$910

Cover design review

$1,830

Equipment

$390

Compost facility - Module VI

$3,660

Design plan review

$650

Liner design review

$1,310

Leachate system review

$910

Drainage plan review

$650

Equipment

$390

Transfer station - Module VII

$1,180

Material recovery facility - Module VIII

$1,570

Waste supply analysis

$650

Waste management areas

$520

Wastewater management areas

$390

Incinerator/Energy recovery facility - Module IX

$3,000

Waste and residue storage

$910

Operational requirements

$1,570

Waste control procedures

$520

Groundwater monitoring - Module X or XI

$3,260

Well placement

$1,310

Materials and specifications

$390

Sampling plan

$1,570

Closure - Module XII

$390

Post-closure - Module XIII

$390

Corrective action - Module XIV

$3,000

Leachate handling Module XV

$1,310

Regulated medical waste storage or transfer facility - Module XVI

$390

Regulated medical waste treatment facility - Module XVII

$390

Permit-by-rule Modification Review and Confirmation

$390

Public participation (does not include costs of newspaper advertisements or radio broadcasts)

$1,040

TABLE 3.1-3. VARIANCE REQUESTS.

TYPE OF VARIANCE

FEE

Base fee for all variances

$390

Supplemental fees based on variance type

Exemption from classification as a solid waste

$520

Variance to permitting requirements

Siting requirements

$520

Facility design (other than alternate liner design)

$520

Operational requirements

--

Groundwater monitoring (other than groundwater protection standards and location of monitoring system)

$920

Closure requirements

--

Post-closure requirements

--

Groundwater Protection Standards

--

Alternate liner system design

$1,570

Location of groundwater monitoring system

$920

Statutory Authority: § 10.1-1402 of the Code of Virginia

Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.