Virginia Administrative Code
Title 9 - ENVIRONMENT
Agency 20 - VIRGINIA WASTE MANAGEMENT BOARD
Chapter 121 - REGULATED MEDICAL WASTE MANAGEMENT REGULATIONS
Part IV - Standards for Regulated Medical Waste Transfer Stations and Treatment Facilities
Section 9VAC20-121-290 - Closure requirements
Current through Register Vol. 41, No. 3, September 23, 2024
A. The owner or operator of a regulated medical waste management facility shall close the facility in a manner that minimizes the need for further maintenance, and controls, minimizes, or eliminates, to the extent necessary to protect human health and the environment, the post-closure escape of regulated medical waste, uncontrolled effluent, surface runoff, or waste decomposition products to the groundwater, surface water, or atmosphere.
B. Closure plan and modification of plan.
C. The owner or operator shall complete closure activities in accordance with the closure plan and within six months after receiving the final volume of wastes. The director may approve a longer closure period if the owner or operator can demonstrate that the required or planned closure activities will take longer than six months to complete, and that the owner or operator has taken all steps to eliminate any significant threat to human health and the environment from the unclosed but inactive facility.
D. The owner or operator shall post one sign notifying all persons of the closing and providing a notice prohibiting further receipt of waste materials. The sign shall remain in place until closure activities are complete. Further, suitable barriers shall be installed at former accesses to prevent new waste from being delivered.
E. The department shall inspect the facility to confirm that the closure is complete and adequate in accordance with this chapter. The department shall notify the owner of a closed facility in writing if the closure is satisfactory, or if unsatisfactory, shall require any necessary construction or such other steps as may be necessary to bring unsatisfactory sites into compliance with this chapter. Notification by the department that the closure is satisfactory does not relieve the operator of responsibility for corrective action to prevent or abate problems caused by the facility.
Statutory Authority: § 10.1-1402 of the Code of Virginia; 42 USC § 6941 et seq.; 40 CFR Part 257.