A. The rated capacity of the crane at the radius at which the lift will be made shall be divided by four and this limit shall not be exceeded.
B. A full-cycle operational test lift shall be made prior to lifting of employees. The platform shall carry twice the intended load during the test lift.
C. All lifts shall be made in accordance with the manufacturer's lifting recommendations.
D. The stability of the footing shall be verified during the full-cycle operational test.
E. The load line on which the platform is suspended will have controlled load lowering. The free-fall option shall not be used with suspended work platforms.
F. The operating mechanism of the clutch of every man-hoist drum shall be provided with a locking mechanism, or interlocked electrically or mechanically with the brake, to prevent accidental withdrawal of the clutch.
G. Any boom crane used to hoist personnel shall be equipped with a brake or brakes which shall be capable of holding the work platform at any point.
H. Lifting bridles on working platforms suspended from cranes shall consist of four legs so attached that the stability of the platform is ensured. The lifting bridle on working platforms suspended from cranes shall be secured by a shackle or attached by a closed hook which cannot open due to load position in the hook.
I. Platform requirements.
Statutory Authority