Virginia Administrative Code
Title 4 - CONSERVATION AND NATURAL RESOURCES
Agency 25 - DEPARTMENT OF ENERGY
Chapter 150 - VIRGINIA GAS AND OIL REGULATION
Part I - Standards of General Applicability
Article 5 - Technical Standards
Section 4VAC25-150-410 - Venting and flaring of gas; escape of oil
Current through Register Vol. 41, No. 3, September 23, 2024
A. It shall be unlawful for any permittee to allow crude oil or natural gas to escape from any well, gathering pipeline or storage tank except as provided for in this section or in an approved operations plan. The permittee shall take all reasonable steps to shut in the gas or oil in the well, or make the necessary repairs to the well, gathering pipeline or storage tank to prevent the escape. All actions shall be consistent with the requirements of an abatement plan, if any has been set, in a notice of violation or closure, emergency or other order issued by the director.
B. A permittee shall drill or repair a well with special diligence so that waste of gas or oil from the well shall not continue longer than reasonably necessary under the following circumstances:
C. No gas shall be flared or vented from a well for more than seven days after completion of the well except in these circumstances:
D. In all cases where both gas and oil are found and produced from the same stratum, the permittee shall use special diligence to conserve and save as much of the gas as is reasonably possible.
E. Venting shall only be used when flaring is not safe or not feasible.
Statutory Authority: § 45.2-103 of the Code of Virginia.