Section 4VAC25-150-320 - Blowout prevention
Current through Register Vol. 41, No. 3, September 23, 2024
A. Applicability. All wells shall be equipped to control formation pressure during drilling and servicing as follows:
B. All blowout preventers, diverters, choke lines, kill lines and manifolds shall be installed above ground level. Casing heads and optional spools may be installed below ground level provided they are readily accessible.
C. The diverter, chokelines and kill lines shall be anchored, tied or otherwise secured to prevent whipping resulting from pressure surges.
D. Pressure ratings.
E. While in service, blowout prevention equipment shall be visually inspected daily. A preventer operating test shall be performed at least once on all the blowout prevention equipment except the blind rams which shall be tested on each round trip.
F. All employees on the rig shall be trained, knowledgeable and able to properly operate the blowout preventer system. In addition, when blowout prevention equipment is installed, at least one person who is certified in blowout prevention and well control procedures by a school of blowout prevention acceptable to the director shall be responsible for the proper testing and operations of the blowout preventers and related equipment.
G. When repairs or other work must be performed to the blowout prevention equipment, drilling and servicing operations must stop until the blowout prevention equipment is returned to service.
H. A record of all tests on the equipment shall be kept at the rig for inspection by the director until drilling or servicing operations have been completed.
Statutory Authority
§§ 45.1-161.3 and 45.1-361.27 of the Code of Virginia.