Virginia Administrative Code
Title 4 - CONSERVATION AND NATURAL RESOURCES
Agency 25 - DEPARTMENT OF ENERGY
Chapter 130 - COAL SURFACE MINING RECLAMATION REGULATIONS
Part 817 - Permanent Program Performance Standards-Underground Mining Activities
Section 4VAC25-130-817.75 - Disposal of excess spoil; zoned concept
Current through Register Vol. 41, No. 3, September 23, 2024
The disposal of spoil under the zoned concept shall meet the requirements of 4VAC25-130-817.71 and the additional requirements of this section.
(a) The fill and appurtenant structures shall be designed using current, prudent engineering practices, and certified by a qualified registered professional engineer experienced in the design of earth and rockfill embankments.
(b) The fill shall be designed to attain a long-term minimum safety factor of 1.5 under static loading conditions and 1.1 under earthquake loading conditions.
(c) All vegetative and organic material and topsoil in the structural and nonstructural zones shall be removed from the disposal area prior to placement of excess spoil. Topsoil shall be removed, segregated and stored or redistributed in accordance with 4VAC25-130-817.22. If approved by the division, organic material may be used as mulch or may be included in the topsoil to control erosion, promote growth of vegetation, or increase the moisture retention of the soil.
(d) Excess spoil shall be transported and placed in a specified controlled manner as follows:
(e) In addition to the inspection requirements of 4VAC25-130-817.71(h), regular inspections by the engineer or specialist shall be conducted during placement and compaction of fill materials in both the structural and non-structural zones.
(f) The design of the fill shall include an internal drainage system which will ensure continued free drainage of anticipated seepage from precipitation and from springs or wet weather seeps.
(g) Surface water runoff from the area above the fill shall be diverted away from the fill and into stabilized diversion channels designed to pass safely the runoff from a 100-year, 6-hour precipitation event or larger event specified by the division. Runoff from the fill surface shall be diverted to stabilized channels which will safely pass the runoff from a 100-year, 6-hour precipitation event. Diversion design shall comply with the requirements of 4VAC25-130-817.43. Temporary diversions may be approved by the division for use during fill construction, provided that erosion is minimized and no threat to the public or the environment results.
(h) The top surface of the fill and any terrace constructed shall be graded such that the final slope after settlement shall be toward properly designed drainage channels. The maximum slope of the top of the fill shall be 20h:1v (5.0%). The vertical distance between terraces shall not exceed 50 feet.
(i) Drainage shall not be directed over the outslope of the fill unless it is in a channel properly designed to minimize infiltration into the fill and to safely pass the runoff from a 100-year, 6-hour precipitation event or larger event specified by the division.
(j) The outslope of the completed fill shall not exceed an overall slope of 1v:2h. The division may require a flatter slope.
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.