Virginia Administrative Code
Title 4 - CONSERVATION AND NATURAL RESOURCES
Agency 25 - DEPARTMENT OF ENERGY
Chapter 130 - COAL SURFACE MINING RECLAMATION REGULATIONS
Part 817 - Permanent Program Performance Standards-Underground Mining Activities
Section 4VAC25-130-817.106 - Backfilling and grading; previously mined areas
Current through Register Vol. 41, No. 3, September 23, 2024
(a) Remining operations on previously mined areas that contain a preexisting highwall shall comply with the requirements of 4VAC25-130-817.102 through 4VAC25-130-817.107, except as provided in this section.
(b) The requirements of 4VAC25-130-817.102(a)(1) and (a)(2) requiring the elimination of highwalls shall not apply to remining operations where the volume of all reasonably available spoil is demonstrated in writing to the division to be insufficient to completely backfill the reaffected or enlarged highwall. The highwall shall be eliminated to the maximum extent technically practical in accordance with the following criteria:
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.