Virginia Administrative Code
Title 4 - CONSERVATION AND NATURAL RESOURCES
Agency 25 - DEPARTMENT OF ENERGY
Chapter 130 - COAL SURFACE MINING RECLAMATION REGULATIONS
Part 784 - Underground Mining Permit Applications-Minimum Requirements for Reclamation and Operation Plan
Section 4VAC25-130-784.24 - Road systems
Current through Register Vol. 41, No. 3, September 23, 2024
(a) Plans and drawings. Each applicant for an underground coal mining and reclamation permit shall submit plans and drawings for each road, as defined in 4VAC25-130-700.5, to be constructed, used, or maintained within the proposed permit area. The plans and drawings shall
(b) Primary road certification. The plans and drawings for each primary road shall be prepared by, or under the direction of, and certified by a qualified registered professional engineer, or a qualified registered professional land surveyor, experienced in the design and construction of roads, as meeting the requirements of this chapter; current, prudent engineering practices; and any design criteria established by the division.
(c) Geotechnical analysis. A report of appropriate geotechnical analysis shall be submitted, where approval of the division is required for alternative specifications, or for steep cut slopes under 4VAC25-130-817.150 and 4VAC25-130-817.151.
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.