Virginia Administrative Code
Title 4 - CONSERVATION AND NATURAL RESOURCES
Agency 25 - DEPARTMENT OF ENERGY
Chapter 130 - COAL SURFACE MINING RECLAMATION REGULATIONS
Part 784 - Underground Mining Permit Applications-Minimum Requirements for Reclamation and Operation Plan
Section 4VAC25-130-784.19 - Underground development waste
Universal Citation: 4 VA Admin Code 25-130-784-19
Current through Register Vol. 41, No. 3, September 23, 2024
Each application shall contain descriptions, including appropriate maps and cross-section drawings, of the proposed disposal methods and sites for placing underground development waste and excess spoil generated at surface areas affected by surface operations and facilities, according to 4VAC25-130-817.71 through 4VAC25-130-817.75. These plans shall describe the geotechnical investigation, design, construction, operation, maintenance and removal, if appropriate, of the site and structures, and be prepared according to 4VAC25-130-780.35.
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.
Disclaimer: These regulations may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.