Utah Administrative Code
Topic - Transportation
Title R916 - Operations, Construction
Rule R916-3 - Design-Build Contracts
Section R916-3-4 - Pre-qualification

Universal Citation: UT Admin Code R 916-3-4

Current through Bulletin 2024-06, March 15, 2024

(1) UDOT may issue a Request for Qualifications (RFQ,) soliciting qualification statements from contractors wishing to submit proposals on a UDOT Design-Build project. The RFQ shall state the minimum and maximum number of highly qualified proposers that will be invited to submit final proposals.

(2) Pre-qualification shall be based on an evaluation of the criteria set forth in the RFQ, including construction experience; design experience; technical competence; capability to perform, including financial, manpower and equipment resources; experience in other Design-Build projects; and past performance.

(3) The field of competing proposers shall be narrowed to the most qualified proposers, not to exceed the number designated in the RFQ. Failure to achieve at least two qualified proposers shall necessitate re-soliciting the project.

Disclaimer: These regulations may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.